Barge Bottleneck Uncorked
Construction of the replacement Lock & Dam 26, on Mississippi River at Alton, Ill. near St. Louis, is described. The $1 billion job, programmed to be built over the period 1979-91,...
Federal Consistency: Facts and Fantasies
The federal consistency provisions at Section 307 of the Coastal Zone Management Act of 1972 (the CZMA, Pub. Law 92-583, as amended) require, in general, that federal agencies act in a...
Informal Regulatory Consultations: Greasing the Skids
Companies considering major coastal zone construction projects should conduct informal consultations with appropriate regulatory and resource management agencies early in the planning...
Foundations for Transmission Line Towers
This special technical publication contains the proceedings of a two session symposium on foundations for transmission line towers. These papers were written by researchers, geotechnical...
Pipe Network Analysis on a Microcomputer
This paper reports on experience gained with the use of commercially available software for pipe network analysis. This information may be helpful to water system managers and consulting...
Economic Analysis Tools for Differential Inflation
Economic decisions based on a life-cycle analysis should consider differential increases or decreases in operation and replacement costs and benefits over the project or component life....
The Briny Deep Comes Ashore
Amusement park attractions are not all fun and games. More than 10 years of planning by dozens of firms went into the Living Seas Pavilion at Walt Disney's Epcot Center. The...
Unified Approach to Reliability-Based Structural Optimization
The purpose of this paper is to present a unified approach to reliability-based structural optimization. The emphasis is placed on recent developments in the field including optimal design...
Serviceability Limit States in Load Space
Deflection and elastic limit state curves are drawn in load space using a nonlinear structural analysis program. Use of load space simplifies computation of point estimates of serviceability...
Fracture-Mechanics-Based Fatigue Life Estimate
Fatigue lives of tee-shaped weldments are estimated using fracture mechanics concepts and crack growth rate data. Fracture mechanics is used to develop an approximate expression for stress...
A Fatigue Study of Prestressing Strand
Strand fatigue data reported in the literature and also from recent tests were combined to form a data base of strand fatigue data which was analyzed using regression analysis techniques....
Building High Tech in China
The tallest steel structure in the People's Republic of China is being built by an international complement of designers, suppliers, vendors and contractors. It is the 42...
Microcomputer Applications for Pavements
The Federal Highway Administration (FHWA) has been active in exploring expanded microcomputer applications with the goal of improving efficiency and benefits to the public through reducing...
Connecticut: A Success Story
The Connecticut Department of Transportation (ConnDOT) had warned the state legislature that its highways and bridges would continue to deteriorate without increased funds for inspection,...
Preliminary Design and Construction Plan for an Ocean Wave Energy Conversion System
A preliminary design and construction plan for a prototype wave energy conversion system is described. While the design methodology and construction procedures are intended for generic...
O'Hare's Showstopper Terminal
United Airlines' new terminal was added to Chicago's O'Hare airport under difficult construction conditions. The airport is one of the world's...
Documenting Construction Claims
Many attorneys think of other professionals associated with a court case as expert witnesses. Another function of engineer and contractor experts is documenting the facts of the claims...
Journal of Performance of Constructed Facilities
The Journal of Performance of Constructed Facilities attempts to improve the quality of the constructed product through interdisciplinary communication. Papers examine the causes and costs of failures...
Analysis of Slow Speed vs. High Speed Generation
This paper presents a discussion of the relative merits of each alternative, with emphasis placed on experience gained from projects recently completed. The discussion considers such factors...
The Hrauneyjafoss Hydroelectric Project in Iceland
The Hrauneyjafoss Hydroelectric Project located in south central Iceland about 100 miles east of Reykjavik was constructed during 1978 to 1982. A maximum gross head of 295 feet is developed...