Relative Survival of Juvenile Chinook Salmon Through Bonneville Dam on the Columbia River
Preliminary results of a multiple year study indicate that juvenile chinook salmon passing through the juvenile bypass system at Bonneville Dam second powerhouse during the summer have...
The PEC Headworks Project?A Cooperative Hydropower Development
The PEC Headworks Project is a single-unit hydroelectric facility located at the headworks of the Potholes East Canal at O'Sullivan Dam on the Potholes reservoir near Moses...
Dam Safety Hydrologic and Seismic Evaluation of TVA'S Beech Dam
Beech Dam is part of the Beech River watershed resource development located in Decatur and Henderson counties in west Tennessee. The development consists of eight dams and approximately...
Measurements of Time Lag in Concrete Gravity Dam Foundations
Uplift measurements from eight large concrete gravity dams show that the time lag between an increase in headwater level and a corresponding increase in uplift pressure is insignificant....
B.C. Hydro's Practice for Assessing the Foundations of Existing Dams on Rock
Since the early 1980's B.C. Hydro has carried out dam safety reviews which included 33 gravity and embankment dams founded on rock. The foundations include moderately jointed,...
Rehabilitation and Replacement of Slab and Buttress Dams at the Wissota Hydroelectric Project
The Wissota Hydroelectric Project is a 70 year old slab and buttress dam which required rehabilitation due to deteriorating concrete. Due to restrictions imposed by the FERC and Owner,...
Foundation Investigations of Concrete Dams
This paper discusses a series of foundation investigations conducted on concrete dams by Pacific Gas and Electric Company. The paper focuses on investigative techniques, equipment, appropriate...
Rocky Mountain Project Seepage Cutoff in Solutioned Limestone
The right abutment of the main closure dam for the Rocky Mountain Project required extensive treatment of deeply weathered shale and solutioned limestone to assure control of seepage and...
Innovative Design for Diversion
A conventional diversion scheme to facilitate construction of the 120 m high rockfill dam for the Beni Haroun project in Algeria would have required three 10 m diameter diversion tunnels....
Assessment of Changes at Glen Canyon Dam
This paper describes the complexity associated with the assessment of financial impacts of proposed and actual short-term restrictions at Glen Canyon Dam. The reasons for these restrictions...
Case Study: Steele Creek Dam Safety Analysis, Bristol, Tennessee
Steele Creek Dam creates a small recreational park lake before discharging into Beaver Creek a few hundred yards below the dam. Existing homes and trailers downstream from this junction...
Risk Analysis Applications for Dam Safety
Dam safety modifications are intended either to reduce the likelihood of the adverse consequences of dam failure or the magnitude of adverse consequences. For instance, widening a spillway...
Examples of Risk Assessment in Dam Safety Decision Making
Three examples of risk-based dam safety evaluations performed for dam users or operators are summarized. These studies were conducted by major U.S. engineering firms and involved experienced...
The Stabilization of Minidoka Powerplant and Dam
The rehabilitation of structures can pose numerous challenges to the engineer. The structure historical preservation, the benefit cost ratio of the rehabilitation, and the stability of...
Stability Analysis of Gravity Dam Foundations with Horizontal Seams
Determination of the overall factor of safety against sliding is an important aspect in concrete dam design. Limit equilibrium methods have serious limitations. A method for determining...
Concrete Gravity Dam Cracking Analysis Methodology
This paper describes a methodology for the prediction and evaluation of cracking behavior in concrete gravity dam's for use in periodic safety investigations as outlined in...
New Techniques and Data Sources for PMP
Testing has been conducted on new methods and storm data sources for the past two years with the purpose of providing more tools to dam owners for the assessment of probable maximum precipitation...
Estimating Uplift in Cracks in Concrete Dams
Results are presented of a three year research program on the modeling of uplift pressures in cracks in concrete gravity dams, and the effectiveness of drains in reducing those pressures....
Uplift Pressures and Strengths for Concrete Gravity Dams
This paper presents an overview of the results of a three year study to compile a database of stability parameters and foundation characteristics for older concrete gravity dams. The database...
Dam Stabilization/Modification at Lighthouse Hill and Schuylerville Hydropower Developments
Remedial measures including posttensioning of concrete structures, earth dike armoring, tainter gate modification and replacement of deteriorated concrete to meet federal and state hydraulic...
Return to search