City of Sedona Wastewater Reclamation Plant Upgrade: How to Teach an Old Dog New Tricks
(No paper) The City of Sedona's early 1990's wastewater treatment plant was difficult to control, prone to plant upsets, near capacity and often experienced on-site sewage spills. Additionally,...

Water Resource Systems and Modeling of the Lower Virgin River Using EXCEL
(No paper) The first objective of this study was to determine the availability of water at the confluence of the Halfway Wash and the Virgin River and to simulate the diversion of river...

Evaluating Alternatives for Capacity Expansion: Ensuring Reliable Water for the Portland, Oregon, Area
(No paper) The Portland Water Bureau is currently evaluating its water supply expansion alternatives. Like many water bureaus responsible for supplying water to both in-city customers...

Water Quality in the Sierra Vista Subbasin, Southeastern Arizona: A Baseline for the Future
As part of the U.S. Geological Survey's (USGS) National Water-Quality Assessment program, water-quality studies were completed in the Sierra Vista subbasin in southeastern Arizona during...

Reversal of Historic Water Level Decline Has Surprising Consequences
(No paper) This paper discusses the causes of the water level rise and options available to the building owner to deal with both the rising water table and VOC contamination....

Ground-Water Quality in Basins with Minimal Urban Development, Arizona
Ground-water quality data (191796) from 2,013 wells in 16 alluvial basins that have minimal urban development, were used to determine the effect of nonurban factors on ground-water quality...

Underground Storage and Recovery: A Powerful Tool for the Management of the Limited Water Resources of the Phoenix Metropolitan Area
(No paper) The availability of imported Colorado River water to the Phoenix area in 1986 prompted the need for storage of the unused portion of each municipality's contracted allocation....

Comparison of Complete Modeling/Simplified Modeling of Zaragoza City Water Supply Network
(No paper) Zaragoza is a Spanish city with 600.000 inhabitants and a water supply network of 900km long. The Council technical services uses a Microstation based GIS, GRED, for network...

Putting Nature First
From salamander tunnels to hotels for red-legged frog, the $450 million Los Vaqueros dam and reservoir project in northern California put environmental concerns first in its planning and...

River Replication
In 1997 a U.S. patent was granted to the U.S. Army Corps of Engineers for a new applied engineering tool and methodology called micromodeling, which uses a small-scale physical model to...

Under Pressure
The Arrowhead East and West contracts for the Inland Feeder water conveyance system being built in California consist of 51,500 ft (15,700 m) of tunnels that cross the San Andreas Fault...

Main Line Mending
Both the Washington Suburban Sanitary Commission (WSSC), of Laurel, Maryland, and the Providence Water Supply Board, of Rhode Island, are conducting massive, multimillion-dollar rehabilitation...

Relining a Relic
By the mid-1980s most of the Boston Low Service water supply network had been in operation for more than 100 years�with little regular maintenance. Many of the system's air...

Sustaining Urban Water Resources in the 21st Century
This proceedings, Sustaining Urban Water Resources in the 21st Century, contains papers presented at the 1997 Engineering Foundation Conference...

Stream Stability and Scour at Highway Bridges
Compendium of Stream Stability and Scour Papers Presented at Conferences Sponsored by the Water Resources Engineering (Hydraulics) Division of the American Society of Civil Engineers
Sponsored by the Water Resources Engineering (Hydraulics) Division of ASCE. This collection contains 75 papers and 321 abstracts presented at conferences...

Environmental Engineering '99
This proceedings, Environmental Engineering 1999, contains summaries of papers presented at the 1999 National Conference on Environmental Engineering...

Tunneling under Trains
The Singapore deep tunnel sewerage system consists of a 90 km long tunnel network that will convey wastewater by gravity flow to two new secondary treatment plants being planned for the...

Conquering the Cold
Three projects�a water treatment plant, an airport, and a hydroelectric plant�illustrate how practicing engineering in Alaska differs from working in the contiguous 48 states. Permafrost,...

For the Duration
The U.S. Army Corps of Engineers developed a new grouting method called duration grouting when constructing the foundations for the Portugues Dam in Ponce, Puerto Rico. The site is marked...

A Joint Effort
In a public-private partnership that required close working relationships, a project that aimed to restore an old canal system� and its waterfront�in Richmond was combined with an effort...

 

 

 

 

Return to search