Cost Control Simulation and Decision Making
Originally published in Journal of the Construction Division, Vol. 103, No. 4, December 1977, pp. 577-591...

Blending Natural Earth Deposits for Least Cost
Originally published in Journal of the Construction Engrg. Division, Vol. 87, No. 1, March 1961, pp. 39-62...

Optimum Life of Equipment for Maximum Profit
Originally published in Journal of the Construction Engrg. Division, Vol. 94, No. 1, January 1968, pp. 41-54...

Optimizing Haul Fleet Size Using Queueing Theory
Originally published in Journal of the Construction Engrg. Division, Vol. 94, No. 1, January 1968, pp. 75-88...

Optimum Replacement Life of Large Scrapers
Originally published in Journal of the Construction Engrg. Division, Vol. 97, No. 1, March 1971, pp. 37-52...

Sensitivity Analysis of Douglas Equipment Life Model
Originally published in Journal of the Construction Engrg. Division, Vol. 98, No. 1, March 1972, pp. 61-78...

Optimum Size of Hauling Units
Originally published in Journal of the Construction Division, Vol. 101, No. 4, December 1975, pp. 853-860...

Optimum Size of Equipment
Originally published in Journal of the Construction Division, Vol. 101, No. 4, December 1975, pp. 861-867...

Optimizing Capital Investments in Construction
Originally published in Journal of the Construction Division, Vol. 102, No. 4, December 1976, pp. 629-636...

Discussion of Optimizing Capital Investments in Construction
Originally published in Journal of the Construction Division, Vol. 103, No. 3, September 1977, pg. 551...

Product Control and Incentives
Originally published in Journal of the Construction Engrg. Division, Vol. 92, No. 3, September 1966, pp. 25-40...

Project Selection Based on Benefits and Costs
Originally published in Journal of the Construction Engrg. Division, Vol. 98, No. 2, September 1972, pp. 149-160...

Weather Effects on Mason Productivity
Originally published in Journal of the Construction Division, Vol. 100, No. 3, September 1974, pp. 319-335...

Reward-Risk Ratio
Originally published in Journal of the Construction Division, Vol. 100, No. 4, December 1974, pp. 521-532...

Modeling Method-Productivity
Originally published in Journal of the Construction Division, Vol. 102, No. 1, March 1976, pp. 157-168...

Portfolio Theory: Applications in Construction
Originally published in Journal of the Construction Division, Vol. 103, No. 1, March 1977, pp. 23-38...

Discussion of Portfolio Theory: Applications in Construction
Originally published in Journal of the Construction Division, Vol. 103, No. 4, December 1977, pg. 657...

Closure of Portfolio Theory: Applications in Construction
Originally published in Journal of the Construction Division, Vol. 104, No. 3, September 1978, pg. 363...

Pittsburgh's Troubled Bridges: What to Do About Them�
The Pittsburgh area is troubled by old bridges that are badly deteriorated. The metropolitan area has more bridges�� 1,700�� than any other. And some 66 of them have weight limits posted....

$80,000 in Payoffs: An Engineer Tells His Story
A member of ASCE was told that if he wanted public work in a certain area, he would have to pay the County Engineer 25% of the project costs. The engineer decided to pay and has regretted...

 

 

 

 

Return to search