IEEE/ASCE TransmissionStructure Foundation Design Guide
The American Society of Civil Engineers' (ASCE) Subcommittee on Foundation Design for High-Voltage Transmission Structures was formed in October 1976. The purpose of the Subcommittee...
Strength Data Base for LRFD of Transmission Lines
Reliability-Based Load and Resistance Factor Design (LRFD) has been proposed as a desirable alternative or a complement to the National Electrical Safety Code (NESC) for the structural...
Special Pile Foundations for a Coastal Permafrost Site
The design of the plant's foundations had to address several challenging geotechnical conditions. These included (1) 'warm' (close to 32 degree F)...
Design of Tension Member Insulated Anchor for Arctic Pipelines
This paper explores the latest development in above-ground waterflood pipe anchors currently being used on the SOHIO operated portion of the Prudhoe Bay Oil Field. The objective of the...
Iceberg Impact Load on a Gravity Based Structure
The mechanics of the eccentric collision of an iceberg against a fixed, rigid, gravity based structure are discussed. A closed form solution is derived for the case of infinite friction...
Building Foundation on Thawed Soil and Permafrost
The site of a planned 10,000 square foot State Youth Facility in Bethel, Alaska was found to be underlain by discontinuous permafrost. This paper describes the geophysical and geotechnical...
35-Year-Old Foundations, Thule Air Base, Greenland
In February 1951 the secret project 'Blue Jay' to construct the base began. Timber piling were used in the foundations of boilers, generators, and other heavy...
Design and Monitoring of an Ice Drill Pad
An ice pad was sucessfully designed and built to provide a suitable foundation for an exploratory drill rig in the National Petroleum Reserve of Alaska in early 1985. Design considerations...
Design Evaluations in Support of Offshore Facilities and Gravel Islands in the Arctic
Development of oil resources in Northern Alaska has involved the design of nearshore and offshore facilities and structures in the Beaufort Sea and Prudhoe Bay in water depths ranging...
Design of Modular Structures for the Arctic
Sohio's efforts to continue the production and initial processing oil from Prudhoe Bay, Alaska requires additional production enhancement equipment on the Alaskan North Slope...
Snow Load Design for Colorado Mountains
During the past decade, Colorado mountain construction has experienced a period of rapid growth. New ski resorts and other business developments have resulted in many new facilities. For...
Reinforced Roads Bridging Voids
A mathematical model was developed to design a pavement section reinforced with a geotextile or related product to span a void. A full scale field test was conducted to verify the model....
Characterization of the Dalton Highway Foundation Soils
A case study is presented of the landform-based probabilistic-statistical route geotechnical characterization of natural foundation soils along the Dalton Highway. Landforms were mapped...
An Economical Approach to Receiving Coal by Rail in the Sub-Arctic Environment
During the period 1983 to early 1985 a multimillion dollar coal transfer facility was designed and constructed in Seward, Alaska. The facility transfers coal from rail cars to temporary...
Long Term Performance of the Goldstream Creek Bridge
In 1964 the Alaska Department of Transportation and the U. S. Army Cold Regions Research and Engineering Laboratory initiated a cooperative study which in the long-term generated a significant...
Anchorage Taps Eklutna Lake for New Water Supply
The 170 million Eklutna Water Project will furnish water to Anchorage, Alaska by the summer of 1988. The project consists of an 8,500-foot long diversion tunnel, 6 miles of 54 to 60-inch...
An Overview of Cold Region Considerations for the Design of the Eklutna Water Project
The paper presents a brief overview of cold regions considerations that were considered during the design of the various elements of the Eklutna Water Project in Anchorage, Alaska. The...
Alyeska Reroutes Trans-Alaska Pipeline at MP 200
This paper discusses the 1985 wintertime repair/reroute to the Trans Alaska Pipeline System (TAPS). The rerouted pipe was approximately 4000 feet long and cost approximately 27 million....
Expert Systems and Engineering Design Knowledge
As in many current AI (Artificial Intelligence) systems, knowledge processing is the most important issue in expert systems. 'Knowledge' in engineering applications...
Applications of Artificial Intelligence in Preliminary Structural Design
The field of Artificial Intelligence (AI) deals with the problems of modeling human intelligence. The application of AI to structural engineering has been limited, but potential applications...
Return to search