Soil Nails as Temporary Powerhouse Support
Newcastle Powerhouse was constructed as an underground structure with its top deck at the finished ground surface. The powerhouse is three-quarter circular and one-quarter square in plan....
An Alternative Approach to the Maximum Flood Concept
This paper outlines an alternative to the current approach for determining the maximum flood of river basins. The condition of the maximum flood is derived from the convolution integral...
The Stabilization of Minidoka Powerplant and Dam
The rehabilitation of structures can pose numerous challenges to the engineer. The structure historical preservation, the benefit cost ratio of the rehabilitation, and the stability of...
Stability Analysis of Gravity Dam Foundations with Horizontal Seams
Determination of the overall factor of safety against sliding is an important aspect in concrete dam design. Limit equilibrium methods have serious limitations. A method for determining...
Seismic Analysis of the Bonneville 1st Powerhouse
The Bonneville 1st powerhouse monoliths were constructed during the period of 1938 to 1942 and were designed against seismic loads using the old lateral coefficient method. The Corps of...
Concrete Gravity Dam Cracking Analysis Methodology
This paper describes a methodology for the prediction and evaluation of cracking behavior in concrete gravity dam's for use in periodic safety investigations as outlined in...
Estimating Uplift in Cracks in Concrete Dams
Results are presented of a three year research program on the modeling of uplift pressures in cracks in concrete gravity dams, and the effectiveness of drains in reducing those pressures....
Uplift Pressures and Strengths for Concrete Gravity Dams
This paper presents an overview of the results of a three year study to compile a database of stability parameters and foundation characteristics for older concrete gravity dams. The database...
Dam Stabilization/Modification at Lighthouse Hill and Schuylerville Hydropower Developments
Remedial measures including posttensioning of concrete structures, earth dike armoring, tainter gate modification and replacement of deteriorated concrete to meet federal and state hydraulic...
Junction Falls Dam Rehabilitation?New Design Incorporates Vintage Concept
Junction Falls Dam was constructed in a gorge of the Kinnickinnic River in 1920 to produce hydroelectric power for the city of River Falls, Wisconsin. In 1988, the River Falls Municipal...
Uplift Reduction Using Drains
Uplift in cracks and in rock-concrete interface plays a crucial role in dam stability. Drains can be designed to intersect these cracks to reduce uplift. This paper explains how the effectiveness...
Effects of Uplift on a Gravity Arch Dam
This paper evaluates the behavior of a gravity arch dam when subjected to normal static loads and internal hydrostatic pressure (uplift). The ability to model uplift has become necessary...
Analysis and Stabilization of Ambursen Dams?Two Case Studies
Case studies are presented about the analysis and rehabilitation of two slab-and-buttress (Ambursen) dams. The paper discusses the investigation techniques used, including sampling of...
The Replacement of Penstocks at TVA Ocoee II Power Plant
The Tennessee Valley Authority (TVA) replaced the steel penstocks at its Ocoee II power plant near Ocoee, Tennessee. A total replacement was necessary because of severe corrosion on the...
Rehabilitation of the Dams at the Crescent and Vischer Ferry Hydroelectric Projects
This paper reviews the dam rehabilitation design and construction techniques used at the New York Power Authority's Crescent and Vischer Ferry Dams. The following are the...
Outlet Works Modifications at Abiquiu Dam
For the installation of a hydroelectric project at the Corps of Engineer's Abiquiu Dam in New Mexico, outlet works modifications that would not affect the structural integrity,...
Civil Design of the Sidney A. Murray Jr. Hydroelectric Station
This paper addresses the general civil design of the Sidney A Murry Jr Hydroelectric Station with special emphasis on the design requirements of the project's unconventional...
Superplasticized Concrete for a Prefabricated Powerplant Structure
This paper describes the use of superplasticized concrete in extremely difficult placements inside a restricted access preassembled powerplant structure (PPS) of a 192 MW Sidney A Murray...
Raising of King Talal Dam
The King Talal Project is located on the Zarqa River, a Jordan River tributary, in Jordan. An existing embankment dam, 100 m high, built in the mid-seventies by the Jordan Valley Authority...
Three Dimensional Modeling of Concrete Dams with Cracks Using Boundary Element Methods
Determining uplift pressure distributions in cracks in a concrete dam requires coupling between crack hydraulics and the stresses and displacements occurring in the rock and the concrete...
Return to search