Structure as Art
The structural engineering to support the architecture of a free-form, Frank Gehry-designed building is never easy, but the engineers for a new university building devised several innovative...
Safeguarding Water Utilities
Immediately after the September 11 terrorist attacks, many water and wastewater utilities adopted or expanded security measures. Now with many systems conducting or planning to conduct...
Degrees of Belief
Subjective Probability and Engineering Judgment
The American Civil Engineers 1852-2002
History, Traditions, and Development of the American Society of Civil Engineers
Published in conjunction with the 150th anniversary of the American Society of Civil Engineers (1852-2002), this new edition covers the founding and development of the nation's...
Dissecting the Collapses
The September 11 terrorist attacks on the World Trade Center horrified the civilized world. An estimated 2,830 human lives were extinguished by these attacks. In the aftermath of the events,...
Physical Model of Current-Induced Scour at Ventura Harbor
This paper describes a 1:25-scale movable-bed physical model study of scour resulting from longshore current passing through a narrow gap on the leeside of the detached breakwater at Ventura...
Comparison of Hydrodynamic Parameters for a Floating Breakwater
The U. S. Army Engineer Research and Development Center is in the process of developing a Rapidly Installed Breakwater System (RIBS) for use in Joint Logistics Over the Shore Operations...
Montioring and Modeling of Tandem Breakwater System at Hammond, IN
A tandem breakwater system was constructed in 1989-90 to provide protection for a large marina at Hammond, IN, at the south end of Lake Michigan. A five year monitoring program (1993-98),...
Design and Construction of the Pier J Breakwaters at the Port of Long Beach, California
Several different alternatives to mitigate surge activity were investigated. The most acceptable solution was a pair of new breakwaters that altered the basin geometry to change the basin...
Construction Factors and Monitoring Methods Relating to the Performance of Ventura Breakwater Core Loc Repair
In 1999 the Los Angeles District of the U.S. Army Corps of Engineers (USACE) repaired the north Ventura breakwater head. The head was rebuilt using 2-ton underlayer stone armored with...
Advances in Buoy Technology for Wind/Wave Data Collection and Analysis
Considerable advances have been made recently to reduce the cost of gathering meteorological and oceanographic data from coastal waters, especially for meteorological and oceanographic...
St. George Habor?Berm Breakwater Construction Considerations
During the period 1984-1987 three berm breakwaters with a total length of approximately 800 meters were constructed at St. George Harbor on St. George Island in the Pribil of Chain of...
Application of Multibeam Echo Sounding and Side Scan Sonar for Mapping of Shoreline Protection Revetments
The use of multibeam survey methodology coupled with high precision positioning systems for the mapping of shoreline protection features and the adjacent offshore areas allows development...
Predicted Service Life of Armor Stone: A Case History
Laboratory testing for determination of true rock quality in terms of expected performance is not clear-cut, may be misleading, and requires extensive interpretation by an expert. This...
Policy Statement 465: Why We Must Raise the Bar
Members of ASCE's Task Committee on the First Professional Degree describe the motivation behind the board of direction's adoption of Policy Statement 465, which...
Update of ASCE Manuals and Reports on Engineering Practice No.74 Guidelines for Electrical Transmission Line Structural Loads
For many months there has been doubt that the latest version of ASCE Manuals and Reports on Engineering Practice No. 74. Guidelines for Electrical Transmission Line Structural Loading,...
Effect of Aluminum Compression on ACSR Conductor Sags at High Operating Temperatures
Deregulation and restructuring are sweeping the electric utility industry in the United States. As a result, many utility engineers are analyzing, re-rating, and upgrading their most critical...
The Inside Story
A full-scale renovation of the interior of Oklahoma City's Civic Center Music Hall required shaving much of the depth from two trusses under load conditions, installing new...
Geotechnical Aspects of Beach Restoration
Large-scale beach restoration undertaken by the U.S. Army Corps of Engineers in Florida requires millions of cubic yards of beach quality sand. Exploration for these sand resources starts...
Rhythm of Beachrock Levels in Contrasting Plate Settings: Rifting Red Sea and North American-Caribbean Plates
Sequences of beachrocks have been compared from the northern Red Sea, the North American plate (north shore of Puerto Rico), and an island of the Caribbean plate. In all these areas the...
Return to search