Sediment Deposition in the Navigation Approach Channel of Three Gorges Project
In this paper, a comparison is made between the problems of sediment deposition in the navigation approach channel of Gezhouba and Three Gorges Project. The investigation shows that the...

Assessment of Risks of Flooding by Use of a Two-Dimensional Model
In case of rare floods, the rivers might go far away from their minor bed, submerging large areas, eventually with relatively high velocities. One-dimensional models are not suitable to...

Flood Risk Management: New Concepts for an Objective Negotiation
It has been tested in a real situation like the Bourbre catch ment, a Rhone tributary in the Isere department, not far from Lyon (France). This catchment is 700 km large, the river is...

Estimating Sediment Conveyance Capacity and Deposition Potential in Culverts
In watersheds characterized by high sediment production, culverts must be designed to adequately convey both water and sediment without causing excessive backwater upstream of the culvert...

Acquisition and Restoration of a Drainage District in the Snohomish River Valley
The purpose of this paper is to present an overview of the efforts by Snohomish County to acquire a drainage district (Drainage District 6) in the lower Snohomish River valley and restore...

Los Angeles River as a Water Source for a Freshwater Reservoir
Simons, Li & Associates, Inc., performed a study to examine the technical feasibility of a freshwater reservoir in the ocean at the mouth of the Los Angeles River through a conceptual...

Calibration of a Water Quality Model Using the Influence Coefficient Algorithm
A methodology based on the influence coefficient algorithm was established for the calibration of QUAL2E reaction coefficients. It was applied to the stream sections of the South Han River...

Water Resources Planning for the Fort Peck Indian Reservation, Montana
Water resources planning in Indian Country has produced varied results. On the Fort Peck Indian Reservation, the Assiniboine and Sioux Tribes are using an integrated approach to managing...

Stochastic Determination of Wave Heights for Flood Control Channels
Physical model data for subcritical and supercritical flow has been collected and analyzed to determine a statistically-based relationship for wave runup heights in a trapezoidal channel....

Study of Hydraulic Jump Lengths on Inclined Channel Beds
A hydraulic jump is generally used to dissipate kinetic energy of flow to protect man-made structures such as spillways, drop structures, and outlet works. It serves as a perfect location...

A Knowledge Based System for the Design of Open Channels
The design of open channel facilities often calls for evaluation of a unique set of physical conditions which do not lend themselves to standard designs and textbook solutions. Consequently,...

Bank Protection Toe-Downs and Local Pier Scour
The zone-of-influence for pier scour may impact bank protection toe-down depths. Countermeasures were required at a site along the Salt River in Phoenix, Arizona when the alignment of...

Restoration Design for Urban Streams: Anacostia River Basin, Maryland
Several stream restoration projects have been undertaken by the Army Corps of Engineers in the Maryland portion of the Anacostia River basin. Measures used include bank stabilization,...

Retrofitting an Urban Watershed for Improved Water Quality
A study was conducted for the Baltimore County, Maryland, Department of Enviromnental Protection, to assess the watershed conditions and stream channel stability of Stemmer's...

Salinity Management for the Upper Gila River
Over development and over allocation of the limited water supply of the S afford valley in eastern Arizona has resulted in serious depletion of water for irrigation in the San Carlos Apache...

Derivation of New Dispersion Coefficient Equation for Natural Streams
A new simple method for predicting dispersion coefficient by using hydraulic and geometric data easily obtained in natural streams has been developed. Dimensional analysis was implemented...

Pollution Transport in Karst
A new model of pollution transport in natural streams was developed and tested. Dead zone storage is modeled as a two time constant process. This approach better matches the observed persistence...

The Costs and Benefits of Dam Removal on the Elwha River
The Elwha River is located on the Olympic Peninsula in the State of Washington. In the early 1900s two hydroelectric dams were built on the Elwha River. Construction of Glines Canyon and...

Optimal Sizing of Width- and Depth-Constrained Trapezoidal Channels
Open-channels are often designed based on the assumption of uniform flow and normal depth. If a channel is to be lined with a nonerodible material, the dimensions of the channel can be...

Large River Diversion Optimization Considering the Uncertainties Involved
Temporary river diversion during major construction (i.e., large dams) is a challenging job. Selection of diversion system capacity and the dimension of the system components are subject...

 

 

 

 