Ground Water Treatment System Using UV/H2O2 at Sacramento Army Depot
Ground water beneath the Sacramento Army Depot (SAAD) is being extracted and treated as part of a ground water remediation program. The extraction system is achieving contaminant capture...

The State Water Board's New Monitoring Requirements
In coordination with Department of Health Services' (DHS) efforts to gain 'State Authorization' to administer the federal hazardous waste management...

Ground Water Recharge in Central and West Coast Basins
The agencies responsible for the Central and West Coast Basins of Los Angeles County, California have managed their ground water supplies by the artificial recharge of reclaimed and imported...

Effect on Soil and Groundwater Due to Long-Term Land Treatment
A comprehensive assessment of the environmental impact of a full-scale, operating overland flow (OLF) land treatment system was made of the Campbell Soup, Inc. OLF system in Paris, Texas....

Proposed California Regulations for Groundwater Recharge with Reclaimed Municipal Wastewater
The proposed California regulations for groundwater recharge with reclaimed municipal wastewater are presented with the basis and rationale for key requirements. The treatment and recharge...

The Greening of Corporate America
Since the decade of the 80's has seen both the most stringent environment regulations as well as the most destructive environmental incidents in our history, most American...

Implementation of Agricultural Reuse in Florida
In mid 1986, the city of Sarasota was faced with the problem of removing a discharge of secondary treated wastewater from Sarasota Bay. The city embarked on a comprehensive evaluation...

Setting Standards in San Diego
Most engineering firms have developed specifications and standards that become the bible for project-related design issues�and no two firms are the same. On complex, large-scale projects...

The Impact of Drought on Hydropower Generation-Case Study of Bureau of Reclamation Hydropower Plant
The paper explores the effects of extended drought on power generation at Shasta hydropower plant, a Bureau of Reclamation facility in Northern California. Statistical measures of water...

Economic Evaluation of Minimum Flow at Rockton
The Rockton Hydroelectric Project is a two-unit, 1,100 kW plant operated by South Beloit Water, Gas & Electric Company, a wholly owned subsidiary of Wisconsin Power & Light...

A Case for Modernizing the Funding and Repayment of Regional Water/Power Projects
Several regional water/power projects authorized by Congress remain unfunded and therefore uncompleted year after year. In this paper examples of such uncompleted projects are examined....

The Use of IFIM for Evaluating Effects of a Flow Alternative on Fish Habitat in a River System with Competing Water Demands
The Instream Flow Incremental Methodology (IFIM) was used to evaluate instream fish habitat in the Platte River in central Nebraska. The IFIM analysis presented herein incorporates 1)...

Altering Federal CVP Power Operations to Accommodate Fisheries' Survival on the Sacramento River
Balancing the needs of the river users, water and power users, and the fishery needs is a formidable task requiring sacrifices by all the users particularly during this time of drought...

Evaluation of Alternatives for Providing Minimum Flows Below TVA's South Holston Dam
TVA is in the initial phases of a project to provide minimum flows in the South Fork Holston River below South Holston Dam. The purposes of the minimum flows at South Holston are to enhance...

Twin Falls Mitigation Plan: Long Term Monitoring of Fish Populations
A fishery monitoring and enhancement plan has been worked out for the Twin Falls Hydroelectric Project which diverts water from a one mile reach of the South Fork Snoqualmie River in Washington...

Pumped Storage, the Environment and Mitigation
The privately financed 1,000 MW Rocky Point Pumped Storage Project located in central Colorado, USA, will be one of the world's highest head, 2,350 feet (716 m), reversible...

Harvest Facility Protects and Improves Fishery
By constructing a trap and transfer/harvest facility to control anadromous fish migration, the trout fishery on the Boardman River was protected and the salmon fishery was improved. The...

Case Study: Central Oregon Siphon Power Project Mitigating Local Concerns
In the early 1980's, 18 hydroelectric projects were proposed for development on the Deschutes River system in Central Oregon. Strong local opposition was a major factor in...

North Fork Feather River Erosion Control Program
PG&E, an investor owned gas and electric utility serving northern and central California, has been engaged since 1984 in the development and implementation of a regional erosion...

Hydrogen Sulfide in Hydropower Reservoirs
Hydrogen sulfide is toxic to aquatic life and corrosive to construction materials at concentrations that are considerably lower than detection limits of analytical procedures commonly...

 

 

 

 

Return to search