Screening Level Modeling in Support of an Estuarine Toxics Management Program
Mathematical models will be used in the future to determine maximum allowable pollutant loading rates for several toxics to the South San Francisco Bay Estuary. This project consisted...
Reuse of an Industrial Wastewater at Saturn
The cooling tower at General Motor's Saturn Plant in Spring Hill, Tennessee will produce blowdown wastewater at rates as high as 500,000 gallons (1893 m3/day)....
Preliminary Investigation into Using Oxidation-Reduction Potential (ORP) for Real-Time Control of Aerobic-Anoxic Sludge Digesters
This research explores the use of Oxidation-Reduction Potential (ORP) to control an Aerobic-Anoxic Sludge Digestion Process. It compares a Fixed-Time Control reactor (3 hours of air on/3...
Composting, Past, Present and Future
Over the past ten years, the composting process has taken on a different look as a method of processing municipal sludge. Today it is one of the most popular and prevalent methods of sludge...
An Analysis of Modeling Techniques in Pollution Management of Natural Water Systems
This paper will focus on various models to demonstrate the difficulties with modeling techniques. The difficulty with developing a valid model for a system is explored through the study...
Allocating Water Among Urban Users During Droughts
Beginning in the spring of 1987, California has been besieged by a drought that, as of this writing, has not yet abated. In response to this unprecedented drought, the San Francisco Water...
Electronic Computation
This proceedings,
Approximate Methods and Verification Procedures of Structural Analysis and Design
This proceedings,
Economic Evaluation of Minimum Flow at Rockton
The Rockton Hydroelectric Project is a two-unit, 1,100 kW plant operated by South Beloit Water, Gas & Electric Company, a wholly owned subsidiary of Wisconsin Power & Light...
A Case for Modernizing the Funding and Repayment of Regional Water/Power Projects
Several regional water/power projects authorized by Congress remain unfunded and therefore uncompleted year after year. In this paper examples of such uncompleted projects are examined....
Evaluating the Dynamic Operating Benefits of Hydro Power Plants
In 1986, the Electric Power Research Institute asked Decision Focus to develop a new planning model to quantify the dynamic operating benefits of power technologies that offer operating...
Improving the Assessment of Instream Flow Needs for Fish Populations
Instream flow requirements are one of the most frequent and most costly environmental issues that must be addressed in developing hydroelectric projects. Existing assessment methods for...
Evaluation of an Eicher Fish Diversion Screen at Elwha Dam
In the spring of 1990, the Electric Power Research Institute (EPRI) initiated testing of an inclined fish screen installed in a 9-foot diameter penstock at the Elwha Hydroelectric Project...
A Demonstration of Strobe Lights to Repel Fish
An EPRI review (EPRI, 1986) of fish protection systems for hydroelectric facilities identified strobe lights as a potential behavioral system to minimize fish entrainment. In 1988, EPRI...
Techniques for Balancing Instream Flow Needs with Project Operation
Balancing power and non-power benefits of hydroelectric developments has become a controversial issue in the relicensing of projects. Multiple project and multiple objective flow management...
The Use of IFIM for Evaluating Effects of a Flow Alternative on Fish Habitat in a River System with Competing Water Demands
The Instream Flow Incremental Methodology (IFIM) was used to evaluate instream fish habitat in the Platte River in central Nebraska. The IFIM analysis presented herein incorporates 1)...
Altering Federal CVP Power Operations to Accommodate Fisheries' Survival on the Sacramento River
Balancing the needs of the river users, water and power users, and the fishery needs is a formidable task requiring sacrifices by all the users particularly during this time of drought...
Evaluation of Alternatives for Providing Minimum Flows Below TVA's South Holston Dam
TVA is in the initial phases of a project to provide minimum flows in the South Fork Holston River below South Holston Dam. The purposes of the minimum flows at South Holston are to enhance...
Twin Falls Mitigation Plan: Long Term Monitoring of Fish Populations
A fishery monitoring and enhancement plan has been worked out for the Twin Falls Hydroelectric Project which diverts water from a one mile reach of the South Fork Snoqualmie River in Washington...
A Water Budget Approach to Instream Flow Maintenance
Storage reallocation is a current issue at many Federal water storage facilities that have hydroelectric generation. Allocation of storage to support instream flows is one of the changes...
Return to search