Taking the Loss Out of Risk
Since Superfund was authorized in 1981 and 22,000 hazardous waste sites put on notice, funds for remedial action have peaked with $20 billion annual clean-up budgets projected. But to...

Generating Alternative Financing Models for Urban Transportation: An Application of the Idea Machine
The purpose of this research was to examine how localities in Virginia could obtain funds for urban highway construction and maintenance, and indirectly, for mass transit from the so-called...

Impact Fees: Florida's Link Between Growth, Road Improvements, and Financing
Impact fees are one mechanism by which local governments can obtain additional revenue needed to construct major roads demanded by the consequences of new development. In Florida, the...

Expert Systems for Civil Engineers
Technology and Application
This book identifies expert systems technology and describes some applications to civil engineering problems. The first part of the book is on expert system technology. Expert system components...

O'Hare's Showstopper Terminal
United Airlines' new terminal was added to Chicago's O'Hare airport under difficult construction conditions. The airport is one of the world's...

Instant Jails
Prison planners are responding to the explosion in the prison population by stepping up construction of new jails. Because of the pressures imposed by court ordered deadlines, engineers,...

Construction Guide Liners
Geomembrane liners for waste construction require meticulous construction, monitoring and weather watching. With much concern over the longevity of geosynthetics, many overlook the extreme...

New Deep Foundations Cut Costs
Two European innovations in deep foundations are highly competitive in cost, time and material. They are the barrette (slurry wall segment) and the bored pile/caisson which is then grouted...

Back on Track at Coney
All New York City subway repairs take place at a repair shop in Coney Island. The shop's floor was plagued by settlement problems since its construction on a filled swamp...

Documenting Construction Claims
Many attorneys think of other professionals associated with a court case as expert witnesses. Another function of engineer and contractor experts is documenting the facts of the claims...

Journal of Cold Regions Engineering
The Journal of Cold Regions Engineering publishes practice- and research-oriented articles from any area of civil engineering that is substantially related to cold regions. Topics include ice engineering,...

Journal of Performance of Constructed Facilities
The Journal of Performance of Constructed Facilities attempts to improve the quality of the constructed product through interdisciplinary communication. Papers examine the causes and costs of failures...

Selection of Small Hydro Project Sites
In the course of studying nearly forty areas in Peru to identify possible sites for small hydro development and in order to select the best in each area for detailed design, the Authors...

Evaluation of Small Hydropower Sites in Ghana, Africa
Six potential small sites and one mini site under construction were visited. Two additional potential sites were identified from map studies. Flow duration studies indicated that with...

Developmental Changes Due to Site Investigations
The Winooski Hydroelectric Company of Montpelier, Vermont is conducting the reconstruction of Dam #8 on the Winooski River in East Montpelier, Vermont. Unprecedented eminent domain proceedings...

Hydroelectric Development on the Illinois Waterway
The feasibility studies and FERC License Applications were completed in August and September, 1983 for three hydroelectric projects on the Illinois Waterway at existing U. S. Army Corps...

Thailand Micro/Mini Hydroelectric Project
The Royal Thai Government is attempting to systematically develop economically attractive indigenous hydropower resources through the Micro/Mini Hydroelectric Project. Initially six experimental...

Overcoming Obstacles to Micro-Hydropower in Developing Countries
This paper presents some examples of approaches to reducing the cost and sophistication of micro-hydropower technology to make this technology more readily accessible, economically attractive,...

The Pelican, Alaska Hydroelectric Station
In August 1983 Pelican Cold Storage directed KPL to install a new 600 kW turbine, synchronous generator, controls and penstock transition section. This new equipment was to fit upon the...

Installation and Startup of the Idaho Falls Bulb Units
The Idaho Falls Low-Head Hydroelectric Demonstration Project consists of the redevelopment of three existing power plants using identical bulb turbines and generators. This paper summarizes...

 

 

 

 

Return to search