Economic Benefit of Irrigation on Beef Ranches
Drought can result in forage shortages leading to possible liquidation of the breeding herd. Liquidation is often at depressed prices, and replacement may be at elevated prices. In this...

The Inflatable Weir and Its Widespread Employment for Irrigation in Japan
Although introduced in the U. S. in the 1950's for groundwater recharging, the inflatable weir has become established only in Japan, in which case it is used almost entirely...

Spread Sheets for Irrigation and Drainage Projects
Land use planners as well as planners from other disciplines use overlays for site analysis but these are usually a qualitative display. Recently the advent of spread sheets coupled with...

Crop Yield Models Adapted to Irrigation Scheduling Programs
A crop yield model (CRPSM) was adapted to match the data obtained with typical irrigation scheduling programs. Daily soil water content was calculated from weather data, crop growth stage...

Garbage: Cogeneration's Third Dimension
Burning garbage or refuse derived fuels (RDF) is becoming more common in cogeneration plants being constructed in the U.S. The three-for-one concept turns one fuel into two products (steam...

Nuclear Waste Disposal: Where Are We?
The U.S. Department of Energy is conducting preliminary site characterizations for three candidates for nuclear waste disposal. The sites are in three different geologic sites. A Richland,...

The Scourge of Scour
Among 86 bridge failures from 1961 to 1976, more were caused by scour than by earthquakes, wind, structural problems, corrosion and accidents combined. Scour is the erosion of a stream...

Building a Team, Not Just a Building
The best way to resolve construction disputes is to head them off. And the best time to step in is before your contractor is hired. In the private sector, there is no reason to open the...

Steel Plate Girder Alternate I-10/I-17 Interchange
The scope of the Phoenix I-10 Viaduct allowed extensive study for the optimization of this moderate span steel plate girder bridge. The value engineering studies lead to the use of the...

Three Automatically Erected Folding Spans
The U. S. Navy has identified three rapidly erected bridges. Each is capable of spanning 400 feet (120 m) with a 70 ton (63 tonne) live load at mid-span. Each will also fold into a 15...

Rehabilitation of the SF Calawah River Bridge
The failure of a 4-span reinforced concrete bridge in Washington State initiated a study that ultimately led to a unique method of bridge rehabilitation. Severe scour resulted in settlement...

The Design of Stays for Cable Stayed Bridges
Much of the R & D work done in the development of details for the modernized form of stayed girder bridges has been contributed by those practicing in the field of prestressed...

Wind Buffeting of Cable-Stayed Bridges During Construction
Some of the dominant loadings on a cable-stayed bridge during construction are a result of the non-uniform vertical and horizontal gust forces on the deck and the associated dynamic response...

Evaluation and Surveillance of Concrete Bridge Structures
A number of cost-effective techniques are available for evaluation and surveillance of concrete bridge structures. The methods covered in this paper include: long-term bridge instrumentation,...

Development and Use of Stress Laminated Timber Deck Bridges
This presentation provides a brief overview of the concepts, development, research needs, economics and recent use of stress laminated timber bridge decks. Repeated articles on the serious...

Wind Tunnel Aeroelastic Model Study of the Baytown Bridge (Steel Alternative)
Analytical and full bridge aeroelastic model studies performed to assess the aerodynamic stability of the steel alternative Baytown Bridge over the Houston Ship Channel are described....

Vancouver's Skytrain Cable-Stayed Bridge?Dynamic Behaviour
This paper focuses on the dynamic behaviour of the Skytrain cable-stayed bridge under the action of earthquakes and wind. The 340 m span railway bridge is located on the west coast of...

Site Hydrology and Basin Design Using Spreadsheets
The Soil Cover Complex Method which was developed by the Soil Conservation Service is a commonly accepted method of evaluating site hydrology. The solution of this method is facilitated...

Effect of Length of Precipitation Record on Recharge Estimates
The effect of the length of precipitation record on groundwater recharge estimates is examined using data from eleven precipitation gages located on the Nevada Test Site. It is concluded...

Assessment & Control of Wind Created Risk During Construction
Structures under construction have been damaged by winds. The damaging winds, typically, are much lower than the design wind loads for completed structures. Little guidance is available...

 

 

 

 

Return to search