Design, Permitting and Initial Operation of a 32 Mw Agricultural Waste Fired Power Plant
Independent power producers are playing an increasingly important role in satisfying the electric power requirements of public utilities. Many of the independent power producers rely heavily...

Raising of an Ash Disposal Pond by Hydraulic Filling
Commercial and industrial development around existing power plant waste disposal sites often precludes the ability to expand these sites laterally. Limitations on land availability have...

The Changing Legal Structure of Non-Utility Generation in the 1990's
Before actual construction of a small power production or cogeneration facility commences, numerous economic, technical and legal factors have been considered during the planning process....

Building Beneath Boston
Up/down construction is a method in which a project's substructure and superstructure are simultaneously built. The substructure's wall, column and foundation...

State Environmental Review of a Proposed Utility Independent Spent Fuel Storage Installation
This paper describes the environmental review process which was applied by the State of Minnesota to a proposed dry cask storage facility. An environmental analysis of the proposed project...

Design & Operational Experience of the NUHOMS?-24P Spent Fuel Storage System
The NUHOMS Spent Fuel Storage System provides a safe and economical method for the dry storage of spent fuel assemblies either at an at-reactor Independent Spent Fuel Storage Installation...

Commissioning of High Level Liquid Waste Facilities
A programme of commissioning tests was carried out on the latest High Level Liquid Waste Evaporation and Storage Facilities constructed at BNF plc Sellafield, England. These tests set...

Nagra's Information Strategy 1991
This paper discusses the acceptance problems faced by nagra, opinion research as a basis for action, the nagra message, transmission measures, communication levels, instruments of communication...

Public Education, Public Confidence, and Public Acceptance of Radioactive Waste Management Facilities
This paper critically examines the conventional assumption that public opposition is a function of public illiteracy and emotionalism by reviewing recent articles on radioactive waste...

MRS Transfer Facility Feasibility Study
Under contract to the U.S. Department of Energy, Parsons was requested to evaluate the feasibility of building a simple hot cell (waste handling) transfer facility at the Monitored Retrievable...

Industry Experience and Programs that Benefit the Monitored Retrievable Storage (MRS) Facility Design
The design objectives and criteria for an MRS must be responsive to the needs and concerns of the public and the industry. It is shown here that to the maximum extent, existing industry...

Opting for Cooperation?A Case Study in Siting a Low Level Radioactive Waste Management Facility
In 1986, the Canadian federal government called a halt to efforts by a crown corporation to site a low-level radioactive waste management facility when it became apparent that continuation...

Transportation Capabilities of the Existing Cask Fleet
This paper describes a number of scenarios estimating the amount of spent nuclear fuel that could be transported to a Monitored Retrievable Storage (MRS) Facility by various combinations...

Some Political Logistics of Nuclear Waste
The need for a centralized, federal, interim storage facility for nuclear waste, or MRS, alledgedly has become more urgent because the date for the opening of the permanent repository...

Evaluation of Storage/Transportation Options to Support Criteria Development for the Phase I MRS
The Department of Energy's (DOE) Office of Civilian Waste Management (OCRWM) plans to develop an interim storage facility to enable acceptance of spent fuel in 1998. It is...

Interim Waste Storage for the Integral Fast Reactor Fuel Cycle Demonstration
An interim storage system design and operating strategy were developed for implementation in the Integral Fast Reactor Fuel Cycle Demonstration. Waste characteristics and thermal power...

Compaq Center East Water Management Plan
This Water Management Plan attempts to balance the many goals which were established in the Master Plan. Major areas of natural vegetation have been preserved. Stormwater quality pond/wetland...

Downstream Danger from Sudden Discharges of Water
The sudden, unexpected release of water by hydropower facilities poses a threat to fishermen and boaters immediately downstream. The characteristics of the danger can be identified, however,...

Drainage Design Criteria: Too Restricted? Too Broad? Too Outdated?
Should drainage design policies be more flexible, leaving the field more open to engineering judgment? Are some policies too loose or broad? Should design criteria more closely reflect...

The Managemet of Storm Water Runoff Associated with Industrial Activity
Section 405 of the Water Quality Act of 1987 mandates that municipal and industrial storm water discharges are point sources of water pollution and are subject to regulation under the...

 

 

 

 