Containment Aspects, Scrubber Sludge Disposal System
Containment of flue gas desulfurization sludge from a coal-fired power plant was accomplished by Dravo Corporation in an environmentally acceptable manner through the construction of an...
Difficult Dam Problems�� Marginal Spillway Stability
In l965 the Corps of Engineers began a program of inspection and reevaluation of its older dams to determine if they are satisfactory based on present day standards. The study of the spillway...
Pueblo Dam - A Bureau of Reclamation First
Pueblo Dam, the first massive-head buttress dam in Bureau of Reclamation history, is nearing completion. Pueblo Dam is a feature of the Fryingpan-Arkansas Project in Colorado. The 23 buttresses...
Difficult Dam Problems�� Stilling Basin Redesign
A landslide of major proportions occurred during construction of Silver Jack Dam in western Colorado. This slide required relocation and redesign of the spillway conduit and basin. Hydraulic...