Preventive Maintenance: Fixing What Ain't Broke
Municipalities are often caught in the cycle of built-neglect-rebuild. For bridges, the solution is preventive maintenance: keep the bridges clean and painted, and they'll...
Parking Garage Crisis
Corrosion in reinforced concrete parking garages is reaching crisis proportions. The rehabilitation market for these structures is estimated to be as much as $750 million a year, or 30%...
Assessing Site Assessments
Laier and Sibley contend that the growth in environmental site assessments, fast becoming routine in many types of real estate transactions, could create a windfall market for engineering...
Rx for Dam Repair
Bernard asserts the growing importance of maintenance to extend the service life of dams as more and more of them reach or exceed their design lives. He describes renovations to Easton...
Affordable Housing
a Challenge to Civil Engineers
This conference proceedings, which consists of 25 papers presented at the National Conference on Affordable Housing held in Miami, Florida on December 6-8, 1989, discusses ways that the...
Metro Project Implementation?The Early Stages
Metro (the Municipality of Metropolitan Seattle) is a federation of governments in King County, Washington which is responsible for regional public transportation and waste water collection...
Getting the Most From Engineering Consultant
The Los Angeles County Transportation Commission ('LACTC') has embarked upon a 150 mile rail transit construction program within Los Angeles County. A program...
Selection of Consultants for Municipal Water/Wastewater Projects
The City of Dallas, Texas Water Utilities Department is responsible for the design and construction of all needed water and wastewater facilities including treatment plants, pump stations,...
U.S. Army Corps Engineers Construction Contract Claims Guidance System
Researchers at the U.S. Army Construction Engineering Research Laboratory (USA-CERL) have been developing an expert system called Claims Guidance System (CGS) to provide claims analysis...
Limitation of Liability as Part of Negotiated Risk Allocation in Engineering Contracts
The use of risk allocation in design contracts has grown considerably over the past eighteen years and is now used extensively by architects and engineers. Negotiated risk allocation has...
Packaging Claims
The paper briefly discusses project records and how they may provide important information for claims, what they should contain, and packaging the claim....
Decision Support System for Achieving and Measuring Design Effectiveness
A microcomputer program is developed to serve as a decision system for improving design effectiveness. The program, called 'Design Effectiveness Evaluation and Implementation...
A User's Guide to Federal Architect-Engineer Contracts
The
Economic Analysis Guidelines?Western Area Power Admin
Guidelines addressing methods and procedures for evaluating benefit and cost components of power projects are being prepared for Western Area Power Administration to use in economic analyses...
Licensing and Relicensing After the Electric Consumers Protection Act of 1986
Recent changes in the Federal Energy Regulatory Commission (FERC) regulations and subsequent, substantive legislative changes have produced a shift in emphasis in the licensing/relicensing...
Independent Consultant's Inspection Reports F.E.R.C. Order No. 122?The First Five Years
On January 21, 1981, the Federal Energy Regulatory Commission (FERC) issued Order No. 122, revising and expanding the periodic inspection program established in 1965 by the Federal Power...
Building Bridges Faster
Guidelines are presented that tell how to write a contract that will lead to radical reductions in the time to build or rebuild a bridge. The article covers how to write an incentive/disincentive...
Dependence of Fatigue Damage on Loading Amplitude Variability
Welded steel specimens have been tested under variable amplitude loadings to determine the extent to which fatigue life is affected by the rate of amplitude variability of the loading...
Fracture Mechanics Fatigue Reliability Assessment Employing the Most Probable Point Locus Method
The statistical distribution of cycle life, N, could be easily constructed if N were an explicit function of the design factors. A simple strategy for constructing the distribution of...
A Statistical Model for Predicting Fatigue Life of Graphite/Epoxy Laminates
A failure stiffness criterion and a residual stiffness degradation model are proposed from which the statistical distribution of the fatigue life of composite laminates is derived. Experiments...
Return to search