Tunneling into the Future
The Chattahoochee Tunnel will increase the wastewater transport capacity of a suburban Atlanta county while greatly reducing the possibility of sanitary sewer overflows into the Chattahoochee...

Degrees of Belief
Subjective Probability and Engineering Judgment
Degrees of Belief artfully weaves together three elements at the very core of engineering: uncertainties in knowledge, inductive reasoning,...

How to Work Effectively with Consulting Engineers
Getting the Best Project at the Right Price for Your Public Constituents
This manual is a comprehensive revision of the previous edition that addresses the procurement of engineering services for a quality project. It outlines the functions of the consulting...

Rising Tide
In an effort to accommodate a new light-rail system in New Jersey between Camden and Trenton, the state's Department of Transportation began the formidable task of enhancing...

Changing Lanes
The Rhode Island Department of Transportation (RIDOT) plans to relocate Interstate 195 in downtown Providence began as a safety improvement project but has since grown into an ambitious...

Water for Ahwatukee
Scheduled for completion in August, the South Mountain Water Facilities pipeline will increase drinking water capacity to the community of Ahwatukee Foothills, a rapidly growing south...

The Submarine Mission
A new Navy engineering and support facility for submarines has been designed and constructed at Lake Pend Oreille, near Bayview, Idaho. The project includes a bridge approach to the facility,...

Berm Breakwaters?Design, Construction and Monitoring
The philosophy of the fieldwork of Berm breakwaters was applied in Iceland. A few case histories were described with emphasis on quarry investigations, design, construction and monitoring....

St. George Habor?Berm Breakwater Construction Considerations
During the period 1984-1987 three berm breakwaters with a total length of approximately 800 meters were constructed at St. George Harbor on St. George Island in the Pribil of Chain of...

Predicted Service Life of Armor Stone: A Case History
Laboratory testing for determination of true rock quality in terms of expected performance is not clear-cut, may be misleading, and requires extensive interpretation by an expert. This...

Big Idea
The reconstruction of the Big I�the intersection of interstate routes 25 and 40 in Albuquerque that was named for its appearance from the sky�was likely to disrupt commuters and interstate...

After the Flood
In June 2001, Tropical Storm Allison struck Texas, subjecting the Houston area to one of the most destructive floods in U.S. history. As part of the recovery effort, the Federal Emergency...

Geotechnical Aspects of Beach Restoration
Large-scale beach restoration undertaken by the U.S. Army Corps of Engineers in Florida requires millions of cubic yards of beach quality sand. Exploration for these sand resources starts...

Testing a Multi-Tiered Stress-Gradient Model for Risk Assessment Using Sediment Constituents from Coral Reef Environments
Coral reefs are threatened worldwide by stresses ranging from local to global in extent. Local stresses range from boat/ship groundings and sewage outfalls to dredging and coastal clearing....

Weighing the Options
A unique sludge pipeline replacement project in Colorado gave the engineers and the owner an opportunity to compare the merits of three different project delivery methods....

Ahead of the Curve
Four curved steel girder bridges for Pittsburgh's light-rail project posed challenges ranging from multiple site constraints to special rail loads and welded rail interactions....

Natural Progression
Engineers made storm-water detention, wetlands mitigation, and environmental safeguarding part and parcel of an industrial expansion project. Designers have created an inviting front yard...

Establishing Baselines For Pipeline Condition Master Planning
As our most of our cities approach complete built-out and much of our wastewater pipelines near the end of their design life, attention needs to be focused on retiring deteriorated first...

Standard Guideline for the Collection and Depiction of Existing Subsurface Utility Data
Development of the referenced Standard began in 1996. It is slated for publication in summer of 2002. The intent of this standard guideline is to present a system of classifying the quality...

Freight Pipelines: Past, Present and Future
Freight pipelines are a set of time-honored methods to transport solids by underground pipelines, and the technology is improving. However, for intercity and interstate freight transport...

 

 

 

 