Connecticut: A Success Story
The Connecticut Department of Transportation (ConnDOT) had warned the state legislature that its highways and bridges would continue to deteriorate without increased funds for inspection,...

Preliminary Design and Construction Plan for an Ocean Wave Energy Conversion System
A preliminary design and construction plan for a prototype wave energy conversion system is described. While the design methodology and construction procedures are intended for generic...

Strategic Planning in Transportation: Uses and Abuses
Strategic planning makes sense because its foundations are in good economic principles. Firms that don't do it are practicing a 'let's live for today'...

Generating Alternative Financing Models for Urban Transportation: An Application of the Idea Machine
The purpose of this research was to examine how localities in Virginia could obtain funds for urban highway construction and maintenance, and indirectly, for mass transit from the so-called...

Impact Fees: Florida's Link Between Growth, Road Improvements, and Financing
Impact fees are one mechanism by which local governments can obtain additional revenue needed to construct major roads demanded by the consequences of new development. In Florida, the...

Expert Systems for Civil Engineers
Technology and Application
This book identifies expert systems technology and describes some applications to civil engineering problems. The first part of the book is on expert system technology. Expert system components...

O'Hare's Showstopper Terminal
United Airlines' new terminal was added to Chicago's O'Hare airport under difficult construction conditions. The airport is one of the world's...

Taipei Trade
The appearance of this building is remarkable�so were the cost savings. A design change form rigid shear walls to a ductile frame helped keep construction of Taipei's World...

Instant Jails
Prison planners are responding to the explosion in the prison population by stepping up construction of new jails. Because of the pressures imposed by court ordered deadlines, engineers,...

Construction Guide Liners
Geomembrane liners for waste construction require meticulous construction, monitoring and weather watching. With much concern over the longevity of geosynthetics, many overlook the extreme...

Shake-Proof Dams
Seismic trouble spots in California and along the Pacific Coast usually get the most publicity. But many people don't realize that Wyoming, Illinois, South Carolina, Utah...

New Deep Foundations Cut Costs
Two European innovations in deep foundations are highly competitive in cost, time and material. They are the barrette (slurry wall segment) and the bored pile/caisson which is then grouted...

Back on Track at Coney
All New York City subway repairs take place at a repair shop in Coney Island. The shop's floor was plagued by settlement problems since its construction on a filled swamp...

Documenting Construction Claims
Many attorneys think of other professionals associated with a court case as expert witnesses. Another function of engineer and contractor experts is documenting the facts of the claims...

Another Geotech Import: Deep Soil Mixing
A technique called deep soil mixing (DSM), imported from Japan, has been used to stabilize an existing dam foundation. When the Bureau of Reclamation discovered that Jackson Lake Dam had...

Journal of Cold Regions Engineering
The Journal of Cold Regions Engineering publishes practice- and research-oriented articles from any area of civil engineering that is substantially related to cold regions. Topics include ice engineering,...

Journal of Performance of Constructed Facilities
The Journal of Performance of Constructed Facilities attempts to improve the quality of the constructed product through interdisciplinary communication. Papers examine the causes and costs of failures...

Evaluation of Small Hydropower Sites in Ghana, Africa
Six potential small sites and one mini site under construction were visited. Two additional potential sites were identified from map studies. Flow duration studies indicated that with...

Developmental Changes Due to Site Investigations
The Winooski Hydroelectric Company of Montpelier, Vermont is conducting the reconstruction of Dam #8 on the Winooski River in East Montpelier, Vermont. Unprecedented eminent domain proceedings...

Hydroelectric Development on the Illinois Waterway
The feasibility studies and FERC License Applications were completed in August and September, 1983 for three hydroelectric projects on the Illinois Waterway at existing U. S. Army Corps...

 

 

 

 

Return to search