Topographic Responses to the Construction of Large Port Structures on Oarai Coast
Large offshore breakwater and groins have been constructed at Oarai Port, Japan. As a result, the coast experienced significant topographic changes. In this paper, the responses of the...

Implementation of Vertical Landfill Expansion
Montgomery County, Maryland, proposed to implement a vertical expansion or 'piggyback' design for the County's municipal solid waste landfill. The...

Remedial Planning for the Former EXPO 86 Site
This paper describes the site characterization and remedial action planning effort that is being undertaken at the former EXPO 86 site in downtown Vancouver, B.C. The 200 acre site on...

Reliability-Based Estimates of Wetland Detention Times for Wastewater Treatment
Determination of the hydraulic residence or detention time is often the first step in design of wetlands constructed for wastewater treatment. Current methods for estimating wetland detention...

Composite Liner, Leak Detection System, and Floating Cover for Nuclear Reactor Emergency Retention Basins
Existing reactor effluent basins are being retrofitted with composite liners, leak detection system and floating covers. Such basins have a 15-year life and remain empty until an accident...

Electronic Computation
This proceedings, Electronic Computation, consists of 46 manuscripts presented at the Tenth Conference on Electronic Computation held parallel...

Approximate Methods and Verification Procedures of Structural Analysis and Design
This proceedings, Approximate Methods and Verification Procedures of Structural Analysis and Design, contains selected papers presented at...

Breaking Down the Barriers
The structural engineering of multistory buildings is a complex and time-consuming chore, but new design and analysis tools can greatly simplify the task. The article traces the development...

CADD for Export
By using sophisticated structural design software and high-speed PCs, engineers in Pittsburgh overcame myriad problems when designing a highrise industrial tower in India. First, they...

North Fork Feather River Erosion Control Program
PG&E, an investor owned gas and electric utility serving northern and central California, has been engaged since 1984 in the development and implementation of a regional erosion...

Benefits and Applications of Modular Hydroelectric Pumped Storage
Hydroelectric pumped storage is the only proven and most efficient technology available for energy storage. It is used by utilities to provide peak and intermediate power and to optimize...

Feasibility of Adding Small Hydro to Federal Hydraulic Structures in the Upper Ohio River Basin
A national hydropower program exists in which non-Federal interests may develop power at Federal hydraulic structures which have that potential. This paper discusses associated considerations...

Lake Siskiyou Power Project
The Lake Siskiyou Power Project was constructed at the foot of the existing Box Canyon Dam on the Sacramento River in Northern California. Major project features included the construction...

Net and Hydroacoustic Monitoring of Fish Passage
In 1986 EPRI published a review of available fish protection technologies for use at hydroelectric facilities. One major conclusion of that study was that fish protection systems were...

Design of Powerhouse Spiral Case Considering Three-Dimensional Action
A commonly used approach of designing semi-spiral cases for Kaplan turbine installation using two-dimensional frames becomes unsuitable for large diameter turbines and/or high heads. The...

Measurements of Time Lag in Concrete Gravity Dam Foundations
Uplift measurements from eight large concrete gravity dams show that the time lag between an increase in headwater level and a corresponding increase in uplift pressure is insignificant....

Potholes East Canal Headworks Project
The construction of 6.5 MW Potholes East Canal Headworks in Washington required near vertical excavation of about 100 ft (30 m) through the existing earthfill dam founded on columnar basalt....

Geotechnical Aspects of the Underground Excavations at the Kemano Completion Project
The Kemano Completion Project is the addition of four generators of 540 MW installed capacity to an existing eight-unit underground hydroelectric generating station owned and operated...

Soil Nails as Temporary Powerhouse Support
Newcastle Powerhouse was constructed as an underground structure with its top deck at the finished ground surface. The powerhouse is three-quarter circular and one-quarter square in plan....

An Alternative Approach to the Maximum Flood Concept
This paper outlines an alternative to the current approach for determining the maximum flood of river basins. The condition of the maximum flood is derived from the convolution integral...

 

 

 

 