Developments in CPM, PERT, and Network Analysis
Originally published in Journal of the Construction Division, Vol. 101, No. 4, December 1975, pp. 769-784...

Cost and Time Scaled Networks: Graphical Model
Originally published in Journal of the Construction Division, Vol. 103, No. 2, June 1977, pp. 179-190...

Discussion of Cost and Time Scaled Networks: Graphical Model
Originally published in Journal of the Construction Division, Vol. 103, No. 4, December 1977, pg. 670...

Closure of Cost and Time Scaled Networks: Graphical Model
Originally published in Journal of the Construction Division, Vol. 104, No. 3, September 1978, pg. 365...

Cost-Time Model for Large CPM Project Networks
Originally published in Journal of the Construction Division, Vol. 103, No. 2, June 1977, pp. 201-211...

Modeling Method-Productivity
Originally published in Journal of the Construction Division, Vol. 102, No. 1, March 1976, pp. 157-168...

Highway Widening Proceeds Behind Concrete Median Barrier
Precast concrete median barrier curb is being used temporarily to protect both workmen and traffic through the 3.1-mile long construction zone of a widening project along the Garden State...

Personnel Management of Engineering Organizations
Which personnel management approaches are most successful, and why? We surveyed ASCE's Sections and Branches in search of answers. And reviewed the 120 or so nominations in...

Subway Designs and Construction Methods That Cut Costs
The high cost of subway construction in the United States can be reduced by adopting station and track structure configurations, structural systems, and construction techniques best suited...

Fast Programming on Small Calculators
A new technique presents a method of rapid programming of engineering formulas on calculators. The method minimizes debugging and documentation time. Formulas are programmed in only one...

Seattle Freeway Park; A Scene of Blissful Contrasts
The Seattle Freeway Park was nominated for honorable mention for OCEA. Although not of massive scale and not dramatically innovative in civil engineering design and construction methods,...

Minnesota Interceptor Sewer Breaks New Ground
The Beltline Interceptor is a gravity interceptor sanitary sewer which has its outlet in St. Paul and its beginning in White Bear Lake. Major requirements called for a design which would...

Ecology and the Past
Archaeologists and paleontologists have gathered an overpowering amount of evidence to show that modern methods of construction, both in the field of highways and in that of architectural...

Pasco-Kenneewick Bridge�� The Longest Cable-Stayed Bridge in North America
This 2503-ft long structure, built in an earthquake zone, is only the second of its kind to be constructed in the U.S. It boasts a continuous concrete girder, supported from steel cables...

Granular-Fill Dam Protected by PVC Membrane
The design and construction of the Minorca Tailings Basin Starter Dam sets a precedent for the use of plastic membrane for seepage control in the construction of earth fill dams where...

Precast Liners May Cut Tunnel Cost 25%
On the Bureau of Reclamation's Buckskin Mountain's Tunnel in Arizona, the low bid was for $58,000,000, about $21,000,000 less than the low bid for design using...

The CRT Computer-Graphics Terminal: Indispensible Design-Aid for Some Structural Engineers
Putting the benefits of computer graphics within the cost reach of many consulting firms are: the development of low-cost ($3,000 to $10,000) storage-tube CRT graphics terminals; and the...

Steel Frame, Precast Floors Meet Impossible Time Constraints
Only 13 months were allotted for expansion of the Captain Cook Hotel in Anchorage, Alaska, which meant that construction would have to continue through the winter months with little down...

Water Harvesting�� Modern Application of an Ancient Method
Water harvesting�The process of collecting natural precipitation from prepared watersheds for beneficial use was the topic of a 3-day symposium held in Phoenix, Arizona, in March 1974....

Numerical Methods in Geomechanics
Proceedings of the Second International Conference on Numerical Methods in Geo-mechanics held at Virginia Polytechnic Institute and State University, Blacksburg, Virginia, June, 1976....

 

 

 

 

Return to search