Hydrologic Studies for Dinkey Creek Hydro-Electric Project
The economic analysis and final design of the 120 MW hydro-electric development on Dinkey Creek, a tributary of the North Fork of the Kings River in the Central Valley of California, requires...

A Case for Selecting Only Deterministic Spillway Design Floods for High Hazard Dams
The Federal Energy Regulatory Commission has under license or exemption from licensing more than 2000 hydroelectric dams. The Office of Hydropower Licensing published, in September 1986,...

Cedar Falls Project-Rehabilitation with RCC
This paper presents an overview of the planning, design, and construction considerations used during the development of the 9. 1 m (30-foot-high) Cedar Falls Roller Compacted Concrete...

Performance of Draft Tubes for Small-Hydropower Turbines
Tests of several conical and elbow-type draft tubes were conducted with varying degrees of upstream swirl. This swirl was generated by variable-geometry vanes. Draft tube efficiencies...

Marginal Small Hydro Can be Made Viable
This paper presents the design and construction aspects of a 1,235 kW small hydro power development, comprising a new dam, gated spillway, intake canal, intake, penstock, tunnel, in-ground...

Improving Design of Small Hydro Plants
One objective of this paper is to show why certain features of many small hydro plants have given poor operational performance or experienced expensive maintenance problems. A second objective...

Murray Hydro Project?Structural Design
This paper will summarize design criteria, parameters, methods of analysis, and other relevant data that were used in the design process of the structural features of the Murray powerhouse...

Conceptual Design of Salt Caves Hydroelectric Project
The Salt Caves Hydroelectric Project, as proposed by the City of Klamath Falls, Oregon, is a prime example of a project where the design has been based on elimination and minimization...

Design of Siphon Penstocks for Low Head Hydros
Siphon penstocks have been designed and constructed at Jim Falls and Winter, Wisconsin at existing dams. Both hydropower projects are located on the Chippewa River. The design of these...

Turbine Intake Modification for Fish Passage
This paper describes one solution the U. S. Army Corps of Engineers has found to improve juvenile fish guidance at Bonneville Second Powerhouse on the Columbia River. Juvenile fish passage...

Sidney A Murray Jr. Hydroelectric Project
The Sidney A Murray Jr. Hydroelectric Project is being designed and constructed by EBASCO Services Inc. for the City of Vidalia (La) - Catalyst, Old River Hydroelectric Ltd Partnership....

Geotechnical Exploration?Rio Bravo Hydro Project
In order for the Rio Bravo Hydroelectric Project to become a reality, a thorough evaluation of alternative project configurations was necessary. Various power canal shapes, sizes, and...

The Gem State Hydropower Project
The Gem State Hydroelectric Project is located on the Snake River about 5 miles southwest of the City of Idaho Falls, Idaho. The project consists of a 40-foot high, 900-foot-long earth...

Design and Operation of a Differential Surge Tank
The differential type of surge tank is more effective in operation than the simple type because it reacts more quickly to load changes of all sizes. The differential tank is also usually...

Long Lake Dam Model Studies
The Long Lake spillway was designed at the turn of the century as a standard ogee section with an upstream batter for a maximum head of 179 feet (55 m). It did not include any energy dissipator....

Headrace Design Studies for the Jim Falls Hydro-Redevelopment Project
The 48 MW Jim Falls Hydropower Redevelopment project on the Chippewa River, Wisconsin, required extensive model studies to facilitate debris sluicing and to prevent intermittent vortex...

Mountain Jungle Intakes?Design and Model Study
Nine intakes of various sizes and designs supply water to the two high head power plants in the Sungai Piah Hydroelectric Development in Malaysia. The intakes are located on steep mountain...

Hydraulic Design and Performance of Discharge Facilities at Revelstoke Project
Revelstoke Project is located in southeastern British Columbia on the Columbia River, 130 km downstream of the Mica Dam and approximately 5 km north of the City of Revelstoke. The project...

Hydropower at Navigation Projects
Hydropower at navigation projects has been found to be compatible with the intended use of the project; however, it is important for the hydropower developer and the project owner to be...

Layout of a Powerhouse Adjacent to Lock and Dam Structures
An approach flow to a powerhouse intake adjoining existing lock and dam structures may cause a significant reduction in the efficiency of the powerhouse and give rise to an economically...

 

 

 

 

Return to search