Avoiding Vibration in Penstocks
One objective of this paper is to indicate the potential sources of pressure pulsations within a hydraulic conduit system and the range of forcing frequencies associated with these sources....
Prefabricated Power Plants, Experience and Prospects
This paper presents the prefabrication concept applied to the Greenup (Greenup Locks and Dam, Ohio River, 72 MW, 1982) and the Sydney A. Murray, Jr. (Old River Control Structures, Vidalia,...
Manasan Ice Control Structure Rehabilitation & Bypass Designs
Ice control works built on the Burntwood River at Manasan Falls were damaged during the 1985 spring break-up. The ice boom had broken and the lowered pond level indicated that the rockfill...
Through-Flow Analysis for Rockfill Dam Stability Evaluations
Existing rockfill dams may have spillways that are not adequate to pass the current probable maximum flood (PMF), having been designed prior to the publication of the latest Hydrometeorological...
Frazil Ice Problems and Solutions at Hydro-Power Intakes
Active and passive frazil ice effects on hydroelectric plant intake design and operation are described and references are provided. The most frequently encountered problems and the basic...
Modernization of the Schoolfield Dam Hydroelectric Powerhouse
This case study describes the retrofitting of a turn-of-the-century powerhouse with modern turbine/generator equipment. The structure consists of numerous turbine bays separated by massive...
Rehabilitation of Dams, Spillways, and Hydroplants
Many older dams are in need of rehabilitation as a result of aging, deterioration, and more stringent safety standards. Concerns include deterioration of original construction materials,...
Dewatering Using a Floating Bulkhead Proves Flexible, Reusable and Cost Effective
Going beyond a traditional bulkhead dropped in place with a barge crane or crane hoist, a steel floating bulkhead was conceived to dewater powerplant intakes, gated spillway bays or outlet...
Dillon Hydroelectric Project Performance Versus Expectations
The Dillon Hydroelectric Project was commissioned in 1987. Design and construction are briefly described; plant availability is compared with design expectations; and maintenance costs...
Fish Bypass System Mathematical Models
Mathematical models for fish diversion systems based on fish behavior in conjunction with diversion system structural and hydraulic properties are developed. Guidance efficiency is described...
Turbines and Pump Turbines for Ultra High Heads
The paper describes the turbine development in Norway as background for high head turbine technology and shows a typical Norwegian high head Francis as an example. High head reversible...
Description and Evaluation of Program: CARIMA
The CARIMA code simulates unsteady free-surface flow in simple or multiply connected systems of rivers or canals. The simulation uses the Preissmann implicit finite-difference method for...
Field Application of Transient and Steady-State Canal Models in Thailand
A transient (unsteady) flow model for simulating the hydraulics in irrigation canal networks was developed and tested in Thailand. A steady-state hydraulic model was subsequently developed...
Numerical Methods for Simulating Debris Blockage Failures and Mudflows
This paper presents the procedures and results from an investigation to evaluate the hydraulic characteristics of mudflow events resulting from hypothetical failures of a debris blockage...
Irrigation Delivery Design with Parameter and Objective Uncertainty
This paper investigates the effects of uncertainty in the design of hydraulic structures in an open-channel system for irrigation water delivery. Uncertainty due to ambiguity in the values...
The NPUSM (Narmada) Model for Modeling Canal Flows
The NPUSM computer program was developed for the analysis of unsteady flows in canals with various types of canal structures to evaluate the Narmada Canal system in Gujarat, India. The...
Discharge Forecast of Underground Tunnel System
An underground tunnel system can be discribed with linear system theory and its mathematical model can be made up according to its recharge and discharge conditions. But, because of so...
Evaluation of the FASTCHEM Model for Predicting Leachate Attenuation at Fossil Power Plants
The Tennessee Valley Authority (TVA) has applied the model FASTCHEM to identify retardation mechanisms and predict solute transport at two fossil power plants. FASTCHEM (acronym for fly...
Hydraulic Aspects of Grade Control Structures
This paper describes the function of grade control structures. The primary purpose of a grade control structure is to maintain or establish a desired bed elevation in a channel. Basically...
Riprap Design Criteria for the ARS Low Drop Structure
The ARS low drop grade control structure has proven to be an effective means to stabilize incised channels in Mississippi. However, field inspections and laboratory testing have indicated...
Return to search