Dynamic vs. Quasi-Static Effluent Limits
Selenium water quality objectives are currently being exceeded in the San Joaquin River, California due to agricultural subsurface drainage discharges. The Federal Clean Water Act requires...

Sources and Circulation of Salt in the San Joaquin River Basin
Historical data and a water quality model were used to quantify the sources of salt, boron and selenium in the lower San Joaquin River (SJR) basin, California. Mean monthly data for sources...

A Regional Management Plan to Improve Water Quality in the Grassland Basin
Seven irrigation and drainage districts on the west side of Californias San Joaquin Valley have formed a regional drainage entity to implement programs that will reduce the load of selenium...

Economic Issues Regarding Water Quality Objectives in the Grassland Basin
A conceptual framework is presented for evaluating the potential costs and benefits of water quality objectives in the Grassland Basin. The investments and expenditures required to achieve...

A Surface Collection Design Approach on the Lower Columbia River
Surface collection and bypass of downstream migrating juvenile salmon has the potential to help improve the survival of the Columbia River salmon population. However, surface passage on...

Surface Bypass-Collector Concepts and Performance
Surfacetype bypass collectors and concepts are described. Biological and engineering requirements to pass juvenile salmonids at Snake?Columbia River dams are presented. The components,...

Flexible Water Deliveries: One District's Experience
The Merced Irrigation District (MID) has implemented two significant incentive programs in 1995 to provide surface irrigation water to farmers who have shifted to private wells for irrigation....

Advanced Seawater Desalination Plant
A project that will demonstrate an enhanced seawater desalination process that operates in combination with upgraded existing coastal power plants to meet part of the projected water needs...

Groundwater Monitoring For a Tunneling Project
The Groundwater Monitoring and Management Plan, developed for the proposed tunnel reaches between Devil Canyon and City Creek, monitors and manages selected water resource features within...

Value Engineering Changes to the Eastside Pipeline
Value Engineering is a process of applying analytic, creative and evaluative techniques to a project in order to make recommendations that will, when implemented, maximize value and quality...

The Secondary Inlet of the Eastside Pipeline Project
The subject of this paper is a design feature included in the current capital improvement program of the Metropolitan Water District of Southern California. This feature, the Secondary...

Impact of Sedimentation Caused by Runoff
As water is pumped into a reservoir, sedimentation caused by runoff can be an important factor in the reservoir's storage capacity. This report discusses various studies conducted...

Mobile Bay Scour Analysis for Mobile and Baldwin Counties, Alabama
Scour analyses were prepared for ten bridges and causeways in and around Mobile Bay on the Gulf Coast of Alabama. Interactions between riverine floods on the Mobile River and tidal storm...

South Carolina Department of Transportation's Statewide Program of Bridge Scour Evaluation
The South Carolina Department of Transportation (SCDOT) has instituted a program to satisfy the FHWAs requirements to evaluate the scour potential of the Nations bridges. The SCDOT's...

Artificial Recharge Using Inflatable Rubber Dams
Artificial recharge of ground water is a necessity in Orange County, California, where natural recharge is insufficient to satisfy water demands. Orange County is part of a semiarid coastal...

Artificial Recharge of a Buried Glacial Aquifer in South Dakota
The Huron Project of the High Plains States Groundwater Demonstration Program was designed to artificially recharge a buried glacial aquifer in eastern South Dakota High flows from the...

Modeling Groundwater Response to a Perimeter Flood
A large industrial facility in the west of France was impacted by a flood in January 1995. Costs associated with the disruption in one week of production were estimated at $15E6 US. In...

Concept Ecology Integrated Project Engineering and Environment; Relating a Project to the Surroundings
The selected alignment of the 27.3 km long Veterans Expressway in Tampa, Florida was constructed for better access to the downtown area from a relatively rural but fast growing area of...

Wetland Mitigation Evaluation Ten Years After Florida Keys Bridge Replacement
From 1912 to 1935, the Florida Keys were connected to the mainland by Henry Flagler's Overseas Railroad. The 1935 Labor Day Hurricane destroyed most of the railroad from Plantation...

Rehabilitating Arctic Tundra in Alaska
During the past 25 years, there has been significant progress in tundra rehabilitation. Initially, agronomic practices requiring large quantities of grass seed and fertilizer were believed...

 

 

 

 

Return to search