Recent Studies on the Optimal Operation of Reservoir Systems in China
Many researchers and engineers have examined the problem of optimal operation of hydro-electric systems in order to exploit the potential of electric power generation. At the same time,...

Estimating Power Plant Cooling Water Demand
The Fayette Power Project (FPP) includes three generation units, with more than 1,500 megawatts of generating capacity, supplying electricity to more than a million Central Texans. The...

A Substructuring Algorithm for Analysis and Optimization of Large Structures on Parallel Machines
An efficient substructuring algorithm is presented for analysis and optimization of frame structures on parallel machines. The underlying concept is to pre-process the input data in such...

Inspection Goes High Tech
Many believe that rehabilitation of the existing infrastructure�not net construction�will dominate the 1990s. Therefore, accurate condition assessment is crucial, since public works agencies...

Computer Applications in the UCB Geotechnical Laboratories
The use of personal computers has become an indivisible part of the University of California at Berkeley (UCB) geotechnical testing laboratories. The University has been on the forefront...

Hurricane Hugo vs Critical Lifelines
Hurricane Hugo significantly affected the performance of critical lifelines in South and North Carolina. An overview of the performance of power supply, transportation, communication,...

Report on Hurricane Hugo and the Response to It by South Carolina Electric & Gas Company
The South Carolina Electric Gas And Company's response to the disaster began even before Hugo Struck. Company employees began preparing for the predicted onslaught. Workers...

Ocean Mining with Shoreline Protection
This paper describes an existing construction system that permits building large concrete structures directly on the water in low-cost floating formwork with unskilled local labor operating...

Reactivation of the Oil and Hazardous Materials Simulated Environmental Test Tank (OHMSETT) Facility
The Oil and Hazardous Materials Simulated Environmental Test Tank (OHMSETT) was run by the Environmental Protection Agency (EPA) from 1974 to 1988. This open-air tank was used to test...

Field Experiment of a Wave Power Extracting Caisson Breakwater
The Ministry of Transport of Japan (MOT) is currently developing a fixed-OWC wave power converter called a wave power extracting caisson. This device can be used as caissons for composite-type...

Environmental Impact of a Power Plant: A Case From a Coastal Area in Venezuela
These are the results of a eight years study in which the ecological effects of Planta Centro power plant were assessed. Many aspects were included in this study, but we concentrate here...

Portland's New Approach to Maintenance
The traditional if it ain't broke don't fix it approach to maintenance was not working for Portland, Oregon's two wastewater treatment plants. By...

Evaluating the Dynamic Operating Benefits of Hydro Power Plants
In 1986, the Electric Power Research Institute asked Decision Focus to develop a new planning model to quantify the dynamic operating benefits of power technologies that offer operating...

Evaluating Hydro Relicensing Alternatives?Impacts on Power and Non-Power Values
The relicensing of 300 hydroelectric plants in the next decade involves a total capacity of about 4,000 MW - a $10 billion value. A methodology recently developed by Decision Focus Incorporated...

A Demonstration of Strobe Lights to Repel Fish
An EPRI review (EPRI, 1986) of fish protection systems for hydroelectric facilities identified strobe lights as a potential behavioral system to minimize fish entrainment. In 1988, EPRI...

Legal Strategy in Dealing with Fish and Wildlife Resource Agencies
This paper is designed to provide a strategy for negotiating with Resource Agencies during the consultation and the 10(j) process. The strategy discussed herein can be reduced to three,...

When FERC Investigates Your Unlicensed Project: A Five-Point Protection Plan
A FERC investigation into a project's jurisdictional status poses the potential for substantial risks and costs. This paper outlines a 'five-point protection...

Development of Small Hydro in Ontario
Ontario is Canada's most populous Province with approximately 10 million residents, representing 40 per cent of the country's population. The electricity needs...

Changing Legal Issues Regarding Transfer of a Plant Up for Relicensing
Part I of the Federal Power Act ('FPA') includes a little understood, but potentially powerful mechanism for encouraging the efficient development and prudent...

The Effects of Recent Legislation on Conventional, Non-Federal Hydropower
Over the past ten years, federal legislation has created competing economic incentives for the hydroelectric industry - loans and tax credit incentives to stimulate the growth of conventional,...

 

 

 

 

Return to search