Regulations
The contractor should meet federal, state, and local regulations. The contractor is responsible for jobsite safety....

Instrumentation and Monitoring
A detailed plan for monitoring possible ground surface movements caused by the microtunneling operations should be prepared. The plan is typically prepared by the engineer in consultation...

Restoration and Cleanup
The contractor should be responsible for site restoration and keeping the construction site clean, neat, and orderly at all times....

Measurement and Payment
The owner shall establish a bid schedule to obtain pricing for all work associated with the microtunneling installation. This bid schedule provides the bidders the opportunity to establish...

Transactions of the American Society of Civil Engineers 2014
Transactions of the American Society of Civil Engineers Vol. 179, 2014 contains abstracts for all ASCE journal and periodical papers and technical notes, Civil Engineering - ASCE feature...

Filling The Bay: Deepening the Oakland Inner and Outer Harbors
The project to deepen the Oakland Inner and Outer Harbors from elevation -42 to -50 ft was federally authorized in 1999 to accommodate the next generation of post-Panamax container ships....

Innovative Use of a Groin Structure: Saving Cost, Shortening the Schedule, and Minimizing Impacts
Almost any type of construction activity can pose a shock to the surrounding environment and habitat. Obviously, the extent of the impact will depend on the location of the project and...

The New Bedford Marine Commerce Terminal
When construction of the first American offshore wind farm support terminal encountered greater challenges than expected, jet grouting enabled construction to continue....

Notes on Heavy Lift Design
The interrelated activities and responsibilities of the various organizations involved in the lift design and offshore installation of topside facilities for an offshore platform are discussed....

Findings From a Joint Industry Study on Foundation Fixity of Jackup Units
During the design storm conditions the soil supporting jack-up unit footings may be close to, or at plastic failure. Accordingly, the use of elastic solutions to the problems of foundation...

Performance Limits for Deepwater Pipelines
This paper highlights the differences between onshore and offshore pipeline design. It then summarizes the results of combined external pressure, tension, and bending testing on full scale...

Extreme Wave-Force Calculation Procedure for 20th Edition of API RP-2A
The paper describes the revised guideline design wave force calculation procedure approved for the 20th edition of the API-RP2A WSD and the first edition of the API-RP2A LRFD and contrasts...

The Joint Industry Development of a Recommended Practice for the Site Specific Assessment of Mobile Jackup Units
The mobile self-elevating (drilling) unit, or jack-up, has been central to the exploration and development of offshore oil and gas reserves. In recent years there has been an increased...

A Simple Model to Predict Soil Resistance to Driving for Long Piles in Deepwater Normally Consolidated Clays
As the exploration and development for offshore oil and gas reserves moves into the deepwater environment of the continental slope, a good model is necessary to evaluate drivability of...

Scope
This chapter includes a brief summary of the scope of the document....

The Hail Problem
Unlike some other forms of precipitation, hail comes in bursts of short duration, falls over isolated and unpredictable locations, and usually occupies only a small percentage of the total...

Hail Concepts
Hail, the product of vigorous deep convection, requires those same conditions that are conducive to the development of thunderstorms. These conditions include water vapor, especially in...

The Design of Hail Suppression Operations
When hail suppression operations are being considered, it is already understood that hail damage is a significant problem in an area in which the political subdivision, organization, or...

Conduct of Operational Hail Suppression Projects
Those conducting hail suppression operations should be vigilant and always prepared to react when potential hailstorms begin to develop. In this chapter, some guidance is provided for...

Evaluation of Hail Suppression Efforts
The rationale for conducting project evaluations is to find out how successful the operations are in achieving the desired results. This assessment is more easily said than done. It is...

 

 

 

 