Innovative Engineering Completes Dredge Spoil Disposal Facility
A large dredge spoil facility was completed for the Fort McHenry Tunnel that received 3.5 million cu yds of dredged material, and was constructed so that it could be converted into a port...
Flowable Fly Ash: A New Cement Stabilized Backfill
Cement stabilized fly ash placed at a plastic fluid consistency is a new structural backfill material that flows into place, either above or below water, without using sophisticated construction...
Civil Engineering: At the Center of Technology for Tomorrow
Between now and the year 2000 civil engineers have the opportunity, perhaps more than any other profession, to help create the monuments of our civilization. This will involve projects...
How Should We Dispose Hazardous Wastes?
Our inability to successfully dispose hazardous wastes has led to extensive land, groundwater and surface water pollution. The question is not whether we have the technology to do the...
Superfund Cleanup Sites
Cleanups of four Superfund hazardous waste sites are described, two in Pennsylvania, one in Tacoma, Wash., and one in Globe, Arizona. The key chemical wastes were polychlorinated bipheynls,...
Probabilistic Characterization of Soil Properties
Bridge Between Theory and Practice
The two objectives established for these proceedings are: (1) to summarize the principles and procedures of probabilistic characterization of soil properties in a readily understood manner...
New Plant Treats River and Well Water
A new 16 mgd water softening plant at Elgin, Ill. is designed to treat raw water either from the Fox River or deep wells, or in any combination. Flexibility of the chemical feed systems...
Fast Tracking Milwaukee's Stormwater Cleanup
In building a massive sewer and treatment plant, Milwaukee solved legal and management problems. At the same time, the city speeded design and construction for the project. Triggered by...
L.A. Grapples with Changing EPA Regs
Environmental Protection Agency (EPA) studies indicate that between now and the year 2000 an additional $117 billion will be needed to accommodate projected growth and to meet water quality...
Retrofitting Lifeline Facilities: The Japanese Approach
A brief history of the prediction of a major earthquake in the Tokai Area of Japan is reviewed. Planning and mitigation incorporating all levels of government and the private sector is...
Intermountain Power Project Seismic Design
Coal-fueled generation units of the Intermountain Power Project are constructed in a seismically active area of Utah (UBC Zone 3). The seismic design criteria were published during the...
Water Supply
The Foothills Project adds 125 mgd (5.5 m�/s) to the Denver area water treatment capacity, and saved approximately $1 million in energy costs in the first year of its operation. The $163...
Prefab Power
The Love Hydroelectric Generating Station, owned by the city of Vanceburg, Ohio, was prefabricated in France complete with all components, brought across the Atlantic and towed to Greenup...
Caisson
The Jamaica Bay Water Pollution Plant was renovated and upgraded from l973-l983 and included sinking a 116 ft. x 105 ft. caisson 50 ft. deep adjacent to city streets and buildings. The...
Sewage Plant
The Sacramento Regional Wastewater Management Program cost $460 million, took 10 years to build, and solved problems in sludge disposal, odor control, conveyance systems, combined sewer...
Energy Recovery
In Albany, N.Y. the state and city cooperated in designing and building a refuse-into-steam energy plant that has several unique features. In most such facilities, the entire plant is...
A Systematic Approach to Conducting Seismic Margin Reviews for Nuclear Power Plants
Deviations from the current codes and standards are considered acceptable in a SMR in areas where the design criteria impose significant conservatism provided the intended function of...
Seismic Evaluation of Non-Seismically Designed Existing Magnox Nuclear Power Plants
Special procedures included on-site testing with a portable shake table, low vibration testing using a structural dynamics analyser, and on-site inspections. The low vibration testing...
A Summary of the Seismic Qualification Utilities Group (SQUG) Program
In 1980, the Nuclear Regulatory Commission (NRC) designated Unresolved Safety Issue (USI) A-46 to address the seismic safety of equipment in operating nuclear power plants. In 1982, the...
Update on Impact Effects in Nuclear Plants Part III?Review of Heavy Object Drop
The consequences of an accidental drop of a heavy component from a lifting device in a nuclear power plant are required to be evaluated even though the device may have been designed using...
Return to search