Constructibility Review of Documents Before Bidding
Many claims have their inception at the very beginning of a project, specifically at the time of bidding. Contractors review the Contract Documents prior to bidding. The way in which they...

Specification Deficiencies?Contract Disputes
The costs of rework, replacement, duplication, delays, and related administration are major factors in disputes. The major reasons for specification-caused disputes are discussed. A three...

Better Design Documents Through Constructibility Review
The Corps of Engineers (Corps) improves the quality of design documents by an extensive program to review in-house and Architect/Engineer (A/E) designs. This review is composed of several...

The Printed Word: A Defense Against Liability?
Design professionals should endeavor not to write burdensome or inaccurate contracts; i. e. , those that inaccurately describe duties. Inspector liability is not relieved by ambiguity...

Construction Inspection?The Last Line of Defense
Construction inspection, or a quality assurance program, is typically the last line of defense in relation to claims for the constructed project. The quality assurance team should be a...

Inspection Costs Versus the Benefits Derived
The following text describes the experiences of a small suburban municipality located in Middle Tennessee before, during and after a five-year program of comprehensive inspection and testing...

Documentation?A Key to Preventing Contract Disputes
From most attorneys' point of view, when the elements of good contract administration are studied and discussed, one of the most important elements is thorough and accurate...

A Systematic Approach to Evaluating the Risk of Contractual Disputes
Construction contract disputes along with A/E malpractice actions have raised much concern in the industry. Considerable literature has been written along the lines of claims avoidance...

An Owner's Role in Dispute Avoidance & Resolution
Construction disputes can be avoided in number and severity through education of the project team. This paper will identify a variety of ways an owner can avoid disputes, pinpointing reasons....

The American Association of Cost Engineers Claims Project
Construction contract disputes, or dressed in their popular nomenclature, 'contract claims', have become an established aspect of the non-residential construction...

Building Condition Assessment�An Owner's Perspective
The Port Authority of New York and New Jersey has recently instituted a program to inspect all of its buildings structures to insure structural integrity and public safety and to provide...

Revitalization of Existing Buildings: An Owner's Perspective
Revitalization of the large stock of existing buildings in this country is of paramount importance today to building owners, who want the value of existing properties to appreciate as...

Evaluation and Modernization of Veterans Administration Facilitaties
This paper discusses two examples showing in detail that procedures for building assessment require much consideration for engineers' programming and must be properly specified...

Changing Priorities in UK Construction Research
This paper addresses two types of situations to contend with in building assessment: aging structures all built at about the same time and to standards no longer acceptable, and newer...

Research Needs for Extant Iron and Steel Buildings
A brief review of iron- and steel-making processes is background for the development of shapes and codes. Sources of information for the condition assessment of iron and steel buildings...

Masonry Rehabilitation: Practice and Research
The rehabilitation of masonry buildings is a major construction activity in the United States. The available techniques and evaluation methodologies are limited to visual investigation...

Analysis of Cracking of I79 Bridge at Neville Island
A large crack was discovered to form in a girder of the I-79 Glenfield Bridge over the back channel of the Ohio River near Pittsburgh on January 28, 1977. A section of the girder containing...

Structural Integrity Assessment of the Flexible 870 Advanced Design Bus
The Grumman Flxible 870, a lightweight advanced design urban bus, entered service in Atlanta, GA in 1978, and some 2,800 of these buses were in service nationwide by 1980. In the autumn...

Prestress and Cracking Problems in Concrete Structural Components of an Elevated Rail Transit Guideway System
In 1983 the Department of Transportation evaluated the quality of construction of selected structural components on the Dade County Transportation Administration METRORAIL elevated guideways....

Investigation of Catastrophic Failure of a Premium-Alloy Railroad Rail
In November 1983 an Amtrak train derailed at a speed of 72 mph (115 kph) at Woodlawn, Texas (in the vicinity of Marshall, Texas), resulting in four fatalities and twenty-four serious injuries....

 

 

 

 

Return to search