Computer Application in Analyzing Change Order Work
In heavy construction, particularly on large tunnel projects, numerous tasks are often performed and inspected simultaneously. The project specifications and contract documents require...

Information Integrated Construction (IIC)
The term 'INFORMATION INTEGRATED CONSTRUCTION (IIC)' was coined to describe the integration of construction information and practice through computer technology. We define information...

Comprehensive Site Monitoring Through Model Based Reasoning
The authors of this paper have developed a computer object oriented intelligent construction site modeler which is dynamically linked to a 3D CAD system. Model Based Reasoning is used...

Advanced Construction Technology System
The Advanced Construction Technology System (ACTS) is a computer database for the classification, documentation, storage and retrieval of information about emerging construction technologies....

Effect of the Periodic Secondary Irregularity on the Dynamic Behaviour of Railway Bridge-Vehicle System
The deformation and vibration of bridge will be developed due to the moving vehicles, especially for railway bridge. The dynamic deflections in the points under each wheel are called secondary...

Safety of Passengers on Railway Platforms?Using Various Computers
Recently, it has become very important to take measures to improve platform safety in Japan. Many passengers use railway platforms all day long (from the first train to the last train)....

Managing AutoCAD and Intergraph MicroStation Systems
The reality today is that Computer Aided Design information is being transferred from one CAD system to another. More often, sharing CAD information among the design team requires multiple...

Using Data Flow Diagrams to Study Communication Process Between Construction Project Participants
The Architecture-Engineering-Construction (AEC) industry is characterized as being highly fragmented. A large number of diverse organizations participate in the planning, design, and construction...

Integrated Resident Management Support
Lack of a common data standard among all construction field offices has added cost to overall U.S. Army Corps of Engineers automation efforts. The creation of a common resident office...

A Work Packaging Process Model for Petrochemical Plant Piping Construction
This paper presents a model for the current work packaging process for petrochemical plant piping construction. The basic foundation of the model is formed by identifying major decision...

Linear Scheduling: A Practical Implementation
This paper describes the features and use of a family of planning structures that provides the basis for a superset of the traditional critical path method which includes linear scheduling....

Resource Leveling Based on the Modified Minimum Moment Heuristic
CPMLevel is an MS Windows computer program that utilizes the minimum moment algorithm to smooth the histogram of a resource in both traditional and overlapped CPM networks. It has interactive...

ICPS: Integrated Construction Planning System by Object-Oriented Planning Models
Knowledge processing for integrated building system planning and construction system planning poses challenging problems to integrate design and construction process efficiently. While...

An Automated Cost Planning System (ACPS) for Construction Projects
This paper suggests an automated cost planning system (ACPS) for planning and scheduling construction projects. The major objective of this system is to further the use of CPM as a planning...

Application of Computer Simulation in the Research of Rail Structure Vibration Reduction
The wheel/rail system is described here as a random vibration system, and the state variables are expressed with quadratic evaluation function. The passive control problem of the random...

A Rezoning Procedure for Finite Element Analysis of Rubber-like Materials
In this paper, we propose a rezoning procedure for finite element analysis of rubber-like materials. Rezoning procedures connect the distorted mesh and the newly created and undistorted...

The Design Navigator
A building design system has no bridge the gap between the complexity of the design information, resulting from the artifact itself, the large amount of laws, regulations, and restrictions,...

Emergency Response Team Siting for HLRW Movements
The shipment of high-level radioactive waste to treatment plants, storage facilities, and repositories is an activity of major national concern. This paper presents a multi-objective methodology...

Multiple Objectives, Uncertainty and Routing Decisions for Hazardous Materials Shipments
Explicit consideration of multiple objectives and uncertainty is important in hazardous materials transportation, particularly in regulating routes or making routing decisions. Application...

A Multimedia Information System for Buildings and Campuses
A multimedia information system currently under development for storage and retrieval of site and building related information is presented. The system is being designed with university...

 

 

 

 