Selection of the Form of Calculated Flood Hydrograph in Projecting Water Release Facilities
Traditionally, in evaluating hydraulic structures, river flood runoff hydrographs are determined by maximum flood water volume and discharge, duration of the flood and some other parameters,...
The Part of Precipitation in Some Ecological Problems of the Dnister Basin
The purpose of the present paper is to study the peculiarity of precipitation falling in the Dnister basin, their distribution on territory, and research of several year's precipitation...
Impact of Point and Nonpoint Discharges on the Water Quality of a Reach of the Red River of the North
Projected increase of discharge of point and nonpoint-source effluents into rivers, make compliance with water quality standards increasingly difficult and necessitate controlling these...
Assessment of the Surface-Water Pollution and Measures for Emergency Stations Warning in the Republic of Uzbekistan
In the Republic of Uzbekistan, a special system operates that is designed for the observations on the quality and ecological state of the river ecosystems including: 1-hydrochemical control...
The 1995 Flood in Southeastern Norway?Operational Forecasting, Warning, and Monitoring of a 200-Year Flood
The southeastern part of Norway experienced during the 1995 spring the highest flood recorded since the devastating flood in July 1789. The snow storage was at the end of April 30 to 50...
The Largest Water Reservoirs of Russia in Flood Control
(Asbtract only) The largest water reservoirs of Russia, such as a reservoirs cascade on Volga and Kama Rivers, are used for solution of a number of water problems including flood control....
Detailed Measurements of Scour at Bridges
The U.S. Geological Survey, in cooperation with the Federal Highway Administration, has recently developed equipment and techniques for collecting detailed bathymetric and hydraulic data...
European Progress on river Renaturalisation
Most restoration projects in Europe have been designed to maximise species richness with little regard for channel stability. To recreate a sustainable natural channel it is necessary...
Ecological and Biological Considerations in River Restoration
When planning river restoration projects, proper consideration must be given to the target resources of concern. This should include provisions to meet the physical, hydraulic, and biological...
River Meander Zones and Floodplain Reconnection
A natural disturbance regime concept is described for understanding ecosystem changes due to human activities. Re-establishment of river meander zones is proposed as an application of...
Anaheim State-of-the-Art Water Treatment Plant?Six Years from Conception to Completion
After six years of intensive planning, budgeting, pilot testing, design, and construction, the City of Anaheim, California, has successfully completed the modifications to the 15 mgd Lenain...
Economic Efficiency of Regulations for Allocation and Control of Surface Water Withdrawals in Humid Regions
This paper proposes several alternative regulatory instruments for the allocation of flowing water and evaluates these instruments with respect to economic efficiency for a hypothetical...
Economic Risk Analysis as a Research Directing Paradigm
Risk analysis could be used to direct a manageable, prioritized strategic plan for evaluating bridge scour research needs. Through risk analysis, the costs of research and the potential...
Selection of Sediment Transport Relations: Part I, Review of Sediment Transport Comparisons
There are a great number of sediment transport relations in existence in the world today. The engineer is often faced with the problem of choosing the most appropriate relation for the...
Selection of Sediment Transport Relations: Part II, Ranges of Dimensionless Numbers
With a large number of sediment transport equations claiming to be applicable within various ranges of hydraulic and sediment parameters, engineers are often faced with the dilemma of...
Hydrodynamic Changes Associated with Navigation Traffic on the Upper Mississippi River System
Research has been conducted at the Illinois State Water Survey for the last five to seven years to collect field data from the Illinois and Mississippi Rivers to determine the extent and...
Distributions of Return Flow in Navigable Waterways
Physical impacts of barge traffic on the riverine environment have drawn increasing attention from resource managers of the Upper Mississippi River System (UMRS). Return flow, which can...
Two-Dimensional Modeling of River Dynamics for the Expansion of Clover Island, Kennewick, Washington
The Port of Kennewick, Washington, is proposing to redevelop Clover Island as a waterfront village concept. The island is located in the Columbia River between McNary and Priest Rapids...
Improving the Speed of Double Lockages
The size of tug and barge combinations on the Upper Mississippi River and Illinois Waterway frequently exceed the dimensions of the lock chambers they must pass through. The locks on these...
Reduction of Sediment Loads in DEC Streams
The U.S. Army Corps of Engineers, Demonstration Erosion Control (DEC) project is actively involved in the stabilization and restoration of many drastically disturbed incising streams in...
Return to search