Planning/Analysis of VPA's Norfolk North Terminal
The Virginia Port Authority (VPA) is developing a new marine container terminal on the northern portion of its land at Norfolk International Terminals (NIT). The terminal is to be designed...

Vacuum Alumina Unloader for Port of Everett
The Port of Everett is in the process of rebuilding and expanding its marine cargo facilities. Much of the Port's waterfront land and facilities were lost to the U.S. Navy Carrier Homeport...

Modifications to Coal Pier 6 Made Necessary by a Deeper Channel
In 1987 it became apparent to the Norfolk Southern Corporation that the U.S. Army Corps of Engineers proposed dredging of the Norfolk, Virginia Harbor would become a reality. Coal Pier...

Technology?Key to Environmental Success
A three million ton per year coal unloading terminal with 5 km overland conveyor at Jacksonville, Florida, incorporates numerous technical advances to achieve environmentally safe construction...

Evolving Mitigation Requirements for Port Development
Mitigation for wetland impacts associated with port development at the Port of Tampa has evolved significantly over the past two decades. A recent major wetland creation program at the...

Application of Traffic Engineering Concepts to Pleasure Boat Traffic
The Los Angeles County Department of Beaches and Harbors initiated a study to investigate the feasibility of adding slips along the main channel in Marina del Rey in response to the surplus...

Case Study ? Elliott Bay Marina Floating Moorage
The recently completed Elliott Bay Marina project in Seattle is one of the larger projects of this type in the country, with 1196 slips ranging from 32 feet to 60 feet, a floating fuel...

Design of Marina Replacement Facilities
A majority of the waterfront design projects within the State of California are for the replacement of existing facilities since the densely populated shoreline areas are already heavily...

Soil Contamination Issues at Port Marine Terminals
A preliminary survey of hydrocarbon contaminated soil and groundwater problems in U.S. west coast ports indicates that the problem occurs in most major port areas. Using the Port of Los...

Securing Strategic National Security Objectives Through Maritime Activities
The President's national security strategy envisions a healthy and growing economy, wise environmental stewardship and a strong military as part of his plan to meet and to fulfill the...

Pile Lateral Load Test in the Port of Los Angeles
Recent wharf projects in West Coast ports have featured rock dikes to contain backland fill and the use of vertical piles embedded in the rock dikes to resist lateral loads. This paper...

Riprap Design in Marine Terminals
Navigation vessels in otherwise quiescent waterways sometimes generate forces that require stabilization of the bed or banks. Since riprap is an accepted and dependable means to armor...

Measured Fill Performance at Berths 212-215 in the Port of Los Angeles
This paper summarizes the performance of an instrumentation fill constructed in open water in the Port of Los Angeles (Port). A new container-handling facility was constructed that consisted...

Non-Intrusive Rayleigh Wave Measurement System for Soil Profiling in Ports
Accurate shear wave velocity profiles have been long recognized as essential data to evaluate the dynamic response of soil deposits and soil-structure interaction under earthquake and...

Proposed Seismic Design Method for Piers and Wharves
Current seismic provisions of the 1991 Uniform Building Code (UBC-91) and the 1983 AASHTO Seismic Design Specifications (AASHTO) are compared as they relate to piers and wharves. An alternate...

Seismic Rehabilitation of Seattle's Pier 69
The Port of Seattle, one of the largest on the west coast of North America, made a strong statement regarding their support for reusing existing structures when a decision was made to...

Dredging Contaminated Sediments: A Monitoring Plan for Boston Harbor
Dredging and blasting will be conducted in Boston's Inner Harbor over approximately a one-year period during construction of the Third Harbor Tunnel. The silty organic surface sediments...

Analysis of Dredged Material Deposition Patterns
Between November 1, 1989 and 30 March, 1990, nearly 1 million cubic yards of dredged material were disposed in Puget Sound as the first phase (Element I) of the construction of the Navy's...

Design Criteria for Ferry Landings
This paper describes an ongoing research project conducted by the University of Washington Department of Civil Engineering to develop design criteria for the Washington State Ferry System....

A Removable Submarine Cover for Drydock No. 2 Modernization
In order to provide balanced overhaul capability and flexibility in the 1990's and beyond, the Portsmouth Naval Shipyard in Kittery Maine, a major U.S. Navy submarine and overhaul repair...

 

 

 

 

Return to search