Nonlinear Analytical Models for Interfacial Plug Stresses in Creeping Salt Formation
Analytical and numerical simulation models are presented which predict the nonlinear time dependent behavior of an expanding plug in a creeping environment heavily dependent on the storage...

Some Recent Advances in Automatic Mesh Generation
The establishment of automated finite element modeling procedures must begin with the development of automatic mesh generators capable of producing a valid finite element mesh for any...

Modern Methods for Automatic FE Mesh Generation
An overview of the various Finite Element mesh generation techniques is presented. Since most automatic FE Mesh Generation techniques read in geometry of the object and create meshes on...

Automating Three-Dimensional Finite Element Mesh Generation
A number of important advances and contributions to the topic of computer aided finite element mesh generation have been made by the Mathematics Department at the General Motors Research...

How Is an Excellent Construction Inspector Developed?
This paper examines the role, attributes, strengths, weaknesses and qualifications of inspectors, and recommends methods of developing an excellent construction inspector. The paper also...

Excellence in Inspection
Excellence in inspection starts with proper interpretation of specifications and drawings. There exists a void between the design team and the field people which must be bridged in order...

Developing Quality Resident Engineers From an RE's Point of View
A good Resident Engineer (RE) is not just an inspector, he is a hybrid of a lawyer, engineer, accountant, manager, administrator, and communicator as well as an inspector. In order for...

The History of Construction Management
Construction Management's origins can be traced to several forerunners, and its development, although short, has seen many changes of both practice and attitude. Its cost...

Quality in the CM Constructed Project
The services of the testing laboratory on construction projects have not generally been considered as part of the construction management function. If the intention of construction management...

Structural Engineering for High Technology Clients
The unique requirements of the high tech industry provide interesting and fascinating challenges to the structural engineer of the 1980's. The following is a list of the most...

Natural Language Processing and Computer Graphics for Engineering Design
This paper describes the development of a natural language processor for plate girder design. A natural language processor for engineering design may be described as a conceptual parser...

Three-Dimensional Boundary Element Techniques for Moving Boundary Problems
The boundary element method (BEM) is a powerful numerical method well suited for a wide variety of engineering problems. The numerical computations are performed only on the boundary of...

Application of Lotus Symphony in Water Quality Modeling
The spreadsheet capability of the Lotus Symphony program package was used to simulate the dissolved oxygen dynamics in streams and rivers. 'Windows' were created...

Graphics Based Preliminary Structural Design
During preliminary design, alternative structural configurations are explored and one or more alternatives are selected for further consideration. During analysis, a structural configuration...

Hierarchical Substructuring for Adaptive Analysis
An algorithm for the automatic generation, from solid models, of finite element meshes organized as spatially addressable quaternary trees (for 2-D analysis) or octal trees (for 3-D analysis)...

Project Management in Wisconsin
The Wisconsin Department of Transportation has a decentralized organization with a central office staff providing functional and policy analysis and eight district offices scattered throughout...

SIMSUPER5: Tunneling Construction Simulation
This paper presents SIMSUPER5 (SIMulation SUPERvisor version 5) a computer program developed to simulate the tunnel construction process under conditions of uncertainty. The program determines...

Expert Systems in Construction Management: Microcomputer Application
Microcomputer based expert systems will assist construction industry by: changing the construction manager's role from day-to-day decision making to strategic planning and...

Computerized Construction Progress Control
In 1983 and 1984, an exploratory tunnel was constructed as part of the geotechnical exploration program for two highway tunnels to be constructed for interstate 70 through Glenwood Canyon,...

Management of Microcomputer Systems
This paper is primarily concerned with the day-to-day management of microcomputer-based systems before, during, and after acquisition. Topics covered include areas overlooked by organizations...

 

 

 

 

Return to search