Retrofit Services: Responding to Today's Market
As a result of the decline in demand for new nuclear power plant construction the nuclear industry has experienced a major change in the nature of business opportunities. To meet the rising...

Structural Considerations for a Radwaste Facility
The structural engineer needs to consider several criteria when designing a radioactive-waste processing facility in order to properly balance the requirements of safety and economy. This...

Look Back and Learn
The cancellations of some nuclear power plants are being attributed in part to cost overruns due to construction-related problems. The experienced civil construction engineer involved...

Decentralization of Nuclear Power Plant Engineering
The cost of nuclear power construction in the past two decades has increased by an order of magnitude, forcing utilities and A/E's to look for ways to reduce engineering and...

Seismic Pope Support Construction Practices
During the mid 1970's the regulatory agencies controlling the design and construction of nuclear power plants began to demand stricter adherence to already existing codes...

Nuclear Power Plant Delays: Probable Causes and Resolutions
The nuclear power industry in the United States is experiencing technological as well as construction and operation problems in nuclear facilities. It is the intent of this paper to review...

Structural Retrofit for Nuclear Power Plants
Retrofitting of nuclear power plants is a major concern these days. Recent rulings of regulatory agencies have affected most of the generating plants in some way. The lessons learned from...

Nuclear Outages: An Approach to Project Controls
The nuclear refueling outage is short-lived, fast paced, and very costly to the nuclear utility. To better control modification expenses and reduce outage-related costs, utilities are...

Modifications At Operating Nuclear Power Plants
In these days of continuing regulatory requirement changes and high interest rates, the engineering of structural modifications for operating nuclear power plants has taken on greater...

Modifying Piping Systems During a Plant Outage
This paper describes methods to reduce problems in design and planning of modifications to piping systems during a nuclear plant outage. Significant differences between original design...

Intact Decommissioning Alternative for Nuclear Power Plants
Previous studies of decommissioning options for nuclear power plants have examined potential alternatives such as immediate dismantlement, entombment, and moth-balling. This paper describes...

Oconee Spent Fuel Rerack
Spent fuel storage problems facing electric utilities with nuclear generation are growing more critical as existing spent fuel storage capacity is utilized. Due to the inaccessibility...

Coping with Transition: Improving the Management Process
At Arkansas Power & Light Company, the Energy Supply Department has some 2,000 employees and operates (in addition to providing General Office engineering, technical, and administrative...

Making Treatment Plants Work
For the most part, past design criteria that have been used were based primarily on historical information from plants that worked or general rule of thumb criteria. With the increasing...

Project Management for the Upper Harlem Electrification Project
The Upper Harlem Electrification Project consists of a 28 mile extension of 700 V. D. C. under-running third (current carrying contact) rail electrification from North White Plains, New...

Seismic Probabilistic Risk Assessment for Critical Facilities
Probabilistic Risk Assessment (PRA) for seismic events is currently being performed for nuclear power plants. The background on seismic PRA is presented along with a basic description...

Soil Movement and Surface Roughness on Wyoming Rangelands
Soil movement and surface roughness parameters were evaluated as a function of response to livestock grazing and semiarid shrub control treatments. Repeated elevation measurements of erosion...

A Giardia Source Investigation in a National Forest Municipal Supply Watershed
For nearly 100 years, the City of Missoula, Montana, obtained most of its municipal water from a surface water supply, Rattlesnake Creek. The Rattlesnake watershed lies within the Lolo...

Cyanide Heap Leaching Problems at Elk City, Idaho
A cyanide heap leaching operation for gold recovery was started in 1983 above the water intake for the community of Elk City in north central Idaho which turned into a problem during the...

Snow Management Practices for Increasing Soil Water Reserves in Frozen Prairie Soils
It is demonstrated that stubble management practices can be used to increase snowcover accumulations in the Canadian Prairies. However, the potential for significant increasing soil water...

 

 

 

 

Return to search