Temporary Structures for Protection and Access
Temporary Structures in Construction Projects (TSC) are utilized for three (3) purposes A. Support (of the structure being built or adjacent structures or utilities) B. Protection (of...

Fall Protection & Debris Containment During Construction
The purpose of this paper is to review the current practices in the United States for both fall protection and debris protection during high rise construction. A performance comparison...

Temporary Lateral Support System for Historic Building Facades in Boston
This paper describes a system of vertically cantilevered structural steel trusses, designed by the author, that provided temporary lateral support for a group of five and six story, 120...

Who Pays for the Unexpected in Construction: Hi-Rise Engineers Point of View
The unexpected in high-rise construction can be traced to design criteria evolving from environmental models and probes, as well as 3 general problems dealing with quality control in contract...

Who Pays for the Unexpected in Construction
The problem of who pays for the unexpected in construction is discussed in relation to the testing and inspection of construction materials. Laboratory is often blamed for poor construction...

Construction Product Performance, The Unexpected
Efforts made in the construction, industry to increase the quality of the constructed facility through the development of new materials and systems and through the reduction of labor intensive...

Construction and Robotics: Problems and Solutions
The role of robotics in construction, and the role played by construction engineers (CE's) is placed in perspective. Robot development, like machine manufacture, has always...

Design and Construction Integration Using Object Oriented Project Model with Multiple-Views
Generating, sharing and maintaining project data among multiple disciplines and throughout a project life cycle is difficult task in the highly fragmented A/E/C industry. Presently, the...

Integrating the Processes of Design, Scheduling, and Cost Estimating Within an Object-Oriented Environment
This paper describes the conceptual design of several processes for performing the stages of building design, construction scheduling, and cost estimating within an object-oriented environment....

The Virtual Design Team: An Object-Oriented Model of Information Sharing in Project Design Teams
The Virtual Design Team (VDT) is an object-oriented, discrete event simulation of a multidisciplinary design team in action. The VDT models a design task as a network of design and design...

Knowledge-Based Paradigms in Layout Generation
The generation of architectural layouts through knowledge-based techniques forms a notable focus in design research efforts. A significant aspect of this research centers upon the development...

Contractor Sponsored Expert System
An expert system being developed for a general building contractor for generating draft schedules for high-rise residential construction is described. Use is made of standard projects,...

Construction Process Knowledge Model to Assist Method Selection?Research in Progress
The project planning stage is a very critical stage in the construction project development and delivery phase of the lifecycle of a building project. This stage creates the framework...

Knowledge-Based Construction Scheduling Support
Research efforts are underway to develop enhanced tools for construction scheduling support. Current work includes the development of an advisor system for considering schedule weather...

Integrated Design and Construction Planning by Knowledge-based Systems
The main objective of this paper is to describe applications of knowledge-based systems for the improvement of planning and management efficiency at the early design stage, and to propose...

Typification and Evaluation in Design
Recently, writers on design theory have characterized the design process as an interaction between broad categories of design knowledge and their application in unique situations. The...

Implicit Design Knowledge and its Impact on Cost Estimating
Construction cost estimating experiences negative impacts due to a design-construction gap created by the fragmented nature of the AEC industry. Most of the design knowledge and data that...

Computer Data Exchange Using National and International Standards
There is a need within the construction industry to electronically transmit standard documents between designers, owners, contractors, and material suppliers. Ideally, the transmission...

Value Engineered Construction
Value Engineering provides us with a systematic approach for looking at design and construction projects with an eye to cost cutting while maintaining or improving value, however value...

Construction Inspection Responsibility from the Viewpoint of a General Contractor and Construction Manager on a GMP Project
Absent local laws to the contrary, any member of the construction team, the Owner, Architect, or Contractor, can theoretically arrange for and provide any testing and inspection that may...

 

 

 

 

Return to search