Current Research and Research Needs in Deep Foundations
This report summarizes the current range of research on deep foundations now being performed in the United States. The report is divided into two main sections: (1) Current research or...

Distillery Wastes Treated and Recovered Energy Saves $1 Million/Yr
The waste treatment and energy recovery for the world's largest rum distillery (Bacardi Corp., San Juan, Puerto Rico) uses an aerobic digestion to treat distillery wastes...

Civil Engineering: At the Center of Technology for Tomorrow
Between now and the year 2000 civil engineers have the opportunity, perhaps more than any other profession, to help create the monuments of our civilization. This will involve projects...

Microcomputers for Construction Field Offices
This paper presents an overview of U. S. Army Corps of Engineers experience with using microcomputers for construction management. Construction management applications for contract administration...

Construction Management Software Requirements
With the rapid improvement in capabilities of microcomputer systems, it is possible to develop software for small computers previously only possible on mini or mainframe computers. This...

Construction Estimating Decision Support Systems
A discussion of important considerations in the development of a computerized Decision Support System (DSS) is presented. These considerations include general hardware and software issues...

Computerized Estimating, What's Right for You
Several good computerized estimating programs exist on the marketplace today. Contractors who avail themselves of good systems can generally realize a very respectable return on their...

Trends in Small Computer Utilization
In an effort to determine the extent to which micro and minicomputers have been successfully implemented by construction contractors, the authors compiled a comprehensive questionnaire...

How Should We Dispose Hazardous Wastes?
Our inability to successfully dispose hazardous wastes has led to extensive land, groundwater and surface water pollution. The question is not whether we have the technology to do the...

Reinforcing Roof Truss Frames Under Load
Without altering the roof structure of an industrial boiler plant, a long-span steel truss frame was modified in place to support heavier loads. The owners of an industrial boiler plant...

Superfund Cleanup Sites
Cleanups of four Superfund hazardous waste sites are described, two in Pennsylvania, one in Tacoma, Wash., and one in Globe, Arizona. The key chemical wastes were polychlorinated bipheynls,...

Limited Field Inspection vs. Public Safety
The traditional role of the design engineer in providing field inspection services has been an important component of public safety in the construction industry. The various aspects of...

Fast Tracking Milwaukee's Stormwater Cleanup
In building a massive sewer and treatment plant, Milwaukee solved legal and management problems. At the same time, the city speeded design and construction for the project. Triggered by...

Refuse Recycling
The refuse recycling plant at Columbus, Ohio, is a pioneer in burning as fuel a combination of refuse and coal. This hybrid fuel has advantages over burning either alone. One winter in...

A Case Study in Low-Level Radioactive Waste Storage
Capital funds have been appropriated for the design, engineering, and construction of an interim low-level radioactive waste storage facility. This project is currently in the preliminary...

Onsite Storage Facility for Low Level Radwaste
The Tennessee Valley Authority (TVA) has designed and constructed an onsite storage facility for low level radwaste (LLRW) at its Browns Ferry Nuclear Plant in northern Alabama. The paper...

Safety Investigations of Existing Spent Fuel Storage Structures for Increased Spent Fuel Storage Capacity
Delays in the solution of disposal problems continue to create the need for additional on-site spent fuel storage capacity at commercial nuclear power generating facilities. Rod consolidation...

Automatic Controls for Industrial Water System
An 8-mile pipeline and associated facilities along its route are controlled by a centralized system consisting of a master station and four remotes. Each site employs Westinghouse programmable...

Environmental Engineering
The purpose of the Annual Conference on Environmental Engineering is to pursue scientific knowledge and promote sound engineering judgement and practice in the solution of the many environmental...

Total Construction Project Delivery Systems
The challenge for the construction industry is for firms to provide total project packages including the design and construction services. The current trend in industry is towards firms...

 

 

 

 

Return to search