Sedimentation in the All-American Canal
During the planning for the All-American Canal, by the U. S. Bureau of Reclamation as part of the Boulder Canyon Project, works were designed at the head of the canal to remove between...

Solving Stormwater Drainage Problems Through an Area Drainage Master Study Program
The Flood Control District of Maricopa County, Arizona, is the floodplain and stormwater management agency for the most densely populated county in the State. A major new tool being used...

Flood Reduction Efficiency of the Water-Management System in Dade County (Miami), Florida
Two tropical weather systems, Hurricane Donna (1960) and Tropical Storm Dennis (1981), produced nearly equivalent amounts of rainfall in a 48-hour period south of the Miami (Florida) area....

Emergency Flood Management, Salt Lake City, Utah
This paper discusses Salt Lake City's response to the floods of 1983 and 1984. Peaks during these years were very high with historic records being set in both years. Management...

Precipitation Analysis in Clark County, Nevada
The Clark County, Nevada Department of Public Works retained Black & Veatch in March 1985 to conduct a study of the Flamingo Wash and to recommend flood protection facilities,...

Stormwater Management in Kansas
This paper evaluates the current stormwater management practices of Kansas cities. This evaluation is based on a survey of all Kansas cities with populations over 10,000. Issues examined...

Design Storms for Urban Drainage
The characteristics of design storms for urban drainage are reviewed. There are indications that, under certain conditions, design storms produce runoff simulation results which are equivalent...

Characteristics of Intense Storms in Kansas
This paper examines point-rainfall characteristics of intense storms in Kansas. Hourly rainfall records were analyzed for 1006 intense storms selected from some 1800 station-years of data....

Selecting a Stormwater Service Level for Urban Control
Recently, more and more emphasis is being placed on the maintenance of pre- and post-development runoff peaks from a specified design storm. The limit on post-development flood peaks requires...

Use of Continuous Simulation Versus the Design Storm Concept for Water Quality
The validity of the design storm concept has been challenged by several investigators since the development of computer simulation models. Of particular interest are the studies that compare...

Outlet Structure Hydraulics
Current detention basin design procedure is to design the outlet structure for two or more return periods. This is sometimes done by combining weirs and/or orifices of various sizes and...

Uncertainties in Groundwater Transport Modeling
Using synthetic data from a hypothetical aquifer, the effects of data availability and data uncertainty were studied by the combined use of a parameter identification (PI) algorithm and...

Estimation and Inference in the Inverse Problem
The estimation of groundwater flow and mass transport parameters is approached via maximum likelihood. Confidence intervals and hypothesis tests as well as the asymptotic properties of...

Mixed Solute Interactions in Groundwater Systems
Research results are presented from a study examining the competitive sorption effects of two organic chemicals, para-dichlorobenzene and 2,4-dichlorophenol, to solids from the Cohansey...

Dredged Spoil Storage Basin in the Coastal Waters Near Rotterdam
The maintenance dredging for the Rotterdam harbour area amounts to 23 million m**3 per year, 10 million m**3 of which is polluted to such an extent that a controlled storage is required....

Land Renewal with Topsoil from Clyde Port Dredgings
The paper examines the potential of using sediment dredged from the River Clyde estuary as a topsoil in land renewal. It presents results, to date (1986), of a study sponsored by the Scottish...

Dredged Material Disposal in the Lower Great Lakes
The Buffalo District Corps of Engineers is responsible for dredging the harbors in Lakes Erie and Ontario. Approximately 2,000,000 cubic yards (1,529,000 cubic meters) of material are...

A Robustness Constraint for the Analysis of Uncertainty
A sensitivity-based definition of system robustness is presented that can be formulated as a constraint within an optimization framework. The optimization framework permits the tradeoffs...

An Optimization Approach for Locating Sediment Ponds in Stripmined Areas
In this study, a mathematical model which can predict erosion from a watershed and incorporated into an optimization model has been investigated. The Erosion-Deposition Model (EDM), which...

Optimization, Simulation and Multiobjective Analysis of Operating Rules for Reservoir Systems
In this paper, three steps are proposed for establishing reservoir operating rules which can be used in real-time without flow forecasting. In the first step, optimization models are used...

 

 

 

 

Return to search