Highway Project Constructability
Results from on-going research into highway project constructibility are discussed. Research objectives and methods are outlined. Prime constructibility objectives are presented along...

A Construction Lawyer Looks at the Legal Aspects of Constructability
The purpose of this article is to set the legal and contractual frame of reference of constructibility by discussing some of the major factors which give to legal disputes or bad jobs...

Project Constructability?A Contractor's View
This paper addresses a contractor's view of what can be done to improve project constructibility from the design through the actual construction of the project. It addresses...

Specification as a Requirement for Hot Mix Asphalt
A brief description of the current national research programs that affect the development of specifications is included in this paper. Elements of the Strategic Highway Research Program...

Specifications and Constructibility
The article discusses these and other aspects of the subject, including training programs for inspectors and project managers, research/development and pilot testing of new products, methods...

Utilization of Specifications
Project specifications need to be practical, enforceable, and above all must be clear and specific enough to enable any competent builder to understand them, bid on them and carry them...

An Effective Cost Control System
Project budgeting consists of converting the capital cost estimate into accountable cost centers by physical or process area and classifications of work. The primary purpose of the project...

The Cost of Quality: A Management Tool
In design and construction of engineered facilities, the cost of quality is a major cost item; perhaps exceeding one fourth the total installed project cost. A simple, flexible Quality...

Tunnel Maintenance Operations
Maintenance considerations during both the design and operational phases are very important to good tunnel maintenance. The use of proper materials able to withstand the rigorous environment...

Maintenance on Underground Subway Construction
The paper discusses maintenance the three types of subway construction in the Bag Area Rapid Transit system: cut and cover, driven tunnel, and prefabricated subaqueous railroad tube. Specialized...

Mobilization for a Construction Project in an Urban Environment
Mobilization by a contractor for the construction of a major project must consider four basic objectives: efficient work performance, owner satisfaction, site safety, and minimal community...

Reflections on Design of a Turnkey Hydro-Power Project?Calaveras, California
Developing the Calaveras project under a turnkey agreement has shown that: (1) some 2 years can be saved, (2) cash flow for the owner is significantly delayed, because engineering is first...

Issues in Computer Based Design/Construction Integration
Design and construction processes are widely regarded as too splintered for industry effectiveness. By improving communication and process integration, reduced costs and improved facilities...

Applications of Computer Graphics in Construction
Stone & Webster Engineering Corporation has implemented an integrated computer system for engineering, design, construction planning, and project management based on a relational...

Effectiveness of Computers in Construction Execution
Although the effectiveness of computers in construction control during execution has been shown in several case studies, their use is largely made for planning functions. Also, their use...

Real-Time Project Tracking
Too often project tracking is based on a job costing program which charges costs to the project based upon invoices from vendors and payrolls of employees. The information obtained from...

Microcomputers in Construction Claims
The increase in litigation is driven primarily by economic factors. The increased use of microcomputers has followed as a direct result of the need for better information control and dissemination....

Why Not a Microcomputer at Each Construction Site?
This paper first considers some of the issues concerning when (and even whether) such an idea is practical. It then looks at how to increase the likelihood of obtaining the desired results....

Transition to Facility Management
The introduction of Computer-Aided Design and Drafting (CADD) capability into facility planning, design, construction, and management provides the capability to better generate, manage,...

Potential Misuse of Construction Scheduling Software
The advent of microcomputers, coupled together with the development of many easy to use and economical scheduling packages, has placed a very powerful tool in the hands of construction...

 

 

 

 