Tying Up The Artery
After six years, preliminary design is almost complete on one of the nation's largest, and most complicated, public works project, the Boston Central Artery project. At an...
Can Engineers Cut Curtain-Wall Failures?
For many reasons, including owners' false perception of economy engineers have abdicated responsibility for curtainwall design. Failures of curtainwall components are very...
Airport Towers: A New Generation
Airport control towers are a unique building type with monumental significance, both for the cities that own and operate the airports, and for the FAA which owns and operates them. Airport...
So Much Pavement, So Little Time
At its most basic, pavement management requires taking inventory of a pavement network, doing a condition assessment, setting up a database, then synthesizing the data collected for an...
What Sank the Lacey Murrow?
This month marks the third anniversary of the sinking of the Lacey V. Murrow Floating Bridge near Seattle, Wash., in the midst of a major rehabilitation project. Early on Nov. 25, 1990,...
The Hazard In Using Probabilistic Seismic Hazard Analysis
Probabilistic seismic hazard analysis has been used extensively for major dams; nuclear power plants; liquefied petroleum gas installations; repositories for dangerous wastes; sensitive...
A Dome To Remember
Under intense pressure from all sides, a trio of engineering and architectural firms working in San Antonio, Tex., turned the political coal of a stadium everyone wanted to build (but...
Ups and Downs in Chicago
The Chicago Title and Trust Center�a 50-story mixed-use complex which opened late last year�offers 1.3 million sq ft of above-grade space, and three levels of below-grade parking. The...
Egypt's Real-Time Water Management
The challenge and complexity of efficiently managing the distribution of the 55 billion m that Egypt draws from the Nile every year has prompted the country's Ministry of...
Imaging the Future
Design professionals of all stripes, including engineers, will find themselves working with a variety of visual images more and more in the near future. Image literacy, an understanding...
Geosynthetics Conquer the Landfill Law
Los Angeles' last operating landfill is undergoing a major expansion using innovative materials in the liner system to overcome difficult site conditions. The design represents...
Overcoming the Woes of Worldwide Work
The author, a civil engineer based in Gibraltar, discusses a variety of pitfalls encountered in international practice, with case histories and lessons learned. They can be caused by differences...
Doing Business In...Bangkok: More than just Temples
Traffic is the most notorious problem afflicting foreign visitors, though air pollution and the enforcement of building codes (in the wake of a provincial hotel collapse in mid-1993) are...
High-Performance Construction Materials and Systems
An Essential Program for America and Its Infrastructure?Executive Report
Prepared by American Concrete Institute; American Institute of Steel Construction; American Iron and Steel Institute; ASCE; Civil Engineering Research Foundation; Concrete Research and...
The Design and Construction of Shuikou Project RCC Diversion Wall
Shuikou Hydroelectric Project, currently under construction on the Minjiang River in the People's Republic of China is a concrete gravity dam having a maximum height of 101...
Tomorrow's Schools
While what's wrong with education looms as a national concern, many communities are doing something positive about it. They're constructing new schools designed...
Experience with Beach Fill Equilibration and Recommended Design Guidelines
Well documented engineering procedures suitable for determining design berm dimensions subsequent to profile equilibration appear to be lacking. Failure to properly account for cross-shore...
Articulating Block Mat Revetment for Whaler's Village
The desire of homeowners to live along the California coastline presents the engineer with many unique design opportunities and constraints. Housing built atop coastal cliffs and bluffs...
Scour Hole Development and Stabilization at Shinnecock and Moriches Inlets, New York
A scour hole developed inside the Shinnecock Inlet channel near the tip of the west jetty. Over the years, this hole deepened to about 70 ft below the mean low water level with the average...
Longshore Sediment Transport Rate at Morro Bay, CA
Estimates of sediment transport rate in the vicinity of Morro Bay Harbor are needed as part of an investigation of possible modifications to the existing Federal project. Because the site...
Return to search