Financial Analysis of Port Facilities
This paper describes a spreadsheet-based structure for financial analysis of port facilities and services, designed for use as a planning tool by non-specialist port managers. The paper...

Port Master Plans and Feasibility Studies
Port projects are cost-intensive long-life irreversible assets, and developing countries particularly limping with resource constraints could not afford the luxury of short-sighted defective...

Gabon Mineral Port Planning
There has been increasing interest in the use of topping-off and top-loading vessel transport systems to ease the burden of expenditures for deepening harbors to fully load large vessels....

Pavement Design for a Break Bulk Terminal Yard
This paper discusses the practical application of mechanistic pavement design principles for a proposed 8. 1 ha break bulk cargo storage yard that is part of the Port of Portland's...

Concrete Block Paving for Marine Terminals
This paper describes the application of concrete block pavements to marine terminals. The Corps of Engineers flexible pavement design approach can be modified to provide a conservative...

Roller Compacted Concrete Pavement for Marine Terminals
This paper describes recent intermodal yard paving projects at the Port of Tacoma, Washington which have utilized a relatively new paving process known as Roller Compacted Concrete (RCC)....

Design of Wharf Facilities, Guam, M.I., to Accommodate Difficult Site Conditions
A wharf facility currently under construction in Guam, Mariana Islands, for the U. S. Navy utilizes precast concrete box caisson construction to satisfy difficult site conditions. To reduce...

An OCEANWHEEL Breakwater
The compression wall and tension spoke structural system (OCEANWHEEL) transfers lateral loads from sea surface to seafloor efficiently. It promises a wide variety of uses beyond the described...

Soil Quality Testing in Ports: Why?
The Port of Seattle has instituted an agency-wide environmental protection guidelines which include the option to prepare site histories and perform chemical screening of soils prior to...

Port Planning after Earthquake Damage
The earthquake of March 1985 affected two important ports in Chile: Valparaiso and San Antonio. While emergency measures succeeded in solving immediate operational problems, there remain...

The Application of Computer Simulation in the Design of Marine Terminals and the Scheduling of Ship Traffic
This paper describes a software package which simulates the operations of marine terminals. The computer programs were designed to assess the effectiveness of the available design alternatives...

Tacoma Sea-Land Terminal: A Project Management Challenge
The Port of Tacoma completed a new two berth container terminal and intermodal yard for Sea-Land in May 1985 in only 26 months after signing a binding agreement. The project, which also...

Terminal 18 Entry Facility?Port of Seattle
This paper presents a successful approach that was used in the planning, design, permit coordination, and expansion of the entry/exit facilities at Terminals 18 and 20 at the Port of Seattle....

Conversion of Keppel Wharves Conventional Berths 42 & 43 to Container Berths C13 and C14, Singapore
With further growth of container traffic expected in the 80's the need for additional facilities was apparent. Following an evaluation of available alternative sites, it was...

Port Expansion of Eastport, Maine
A recent pier expansion now allows Eastport to provide 40 feet of water at low tide. The pier expansion consists of a concrete-decked steel pipe pile-supported extension to an existing...

Tacoma Terminals Pier Designed for Economy
This pier is a representative and highly refined sample of what is known as the Puget Sound system of construction, an economical system that maintains the durability necessary in the...

Carnation Terminal, Oakland?Preliminary Design
The Preliminary Design process is examined as it was applied to design of wharves for a new container terminal in the Port of Oakland, California. The process includes active interdisciplinary...

Designing Marinas to Mitigate Impacts
The John Wayne Marina was permitted for construction only after certain design features were altered to accomodate major biological and water quality concerns. The moorage basin was relocated...

Marina Design and Environmental Concern
Research initiated by a Florida Cabinet Resolution of August 6, 1974, has generated two models for the evaluation of the impact of marina development on coastal waters. One, a complex...

Siltation of the Port of Astoria
Sedimentation rates suddenly increased in the Port of Astoria, Oregon, immediately following the May 18, 1980 ash eruption of Mt. St. Helens. This ash was transported down the Columbia...

 

 

 

 