Financing and Marketing Feasibility Tests for Proposed Federal Hydroelectric Power Projects
The Southwestern Power Administration (SWPA), an agency of the Department of Energy, is responsible for marketing the power and energy produced at Federal hydroelectric power projects...
Evaluation of Hydro Facilities for Sale to Another Utility
STS Hydropower had been contacted by a major industrial client near one of the STS regional offices for the purpose of evaluating both the technical and financial status of several operating...
New Martinsville Hydroelectric Project
The New Martinsville Hydroelectric Project consists of a dual bulb unit, 34 MW powerhouse constructed at an existing lock and dam navigation facility. The project was completed on budget...
The Construction of the Sidney A. Murray, Jr. Hydroelectric Power Plant
The project, consisting of eight 8.2m bulb turbines rated at 192MW, is located in the State of Louisiana and will use a portion of the water diverted from the Mississippi River to the...
Feasibility, Licensing and Design: Bradley Lake Hydroelectric Project
This paper describes the licensing, environmental, engineering, and design aspects of the project. Due to the project's remote location and geological setting, the paper will...
Turbine Runner Procurement for the Robert Moses Niagara Power Plant Upgrade
Procurement of the new runners involved the selection of two manufacturers who have entered into a design competition in which competing models will be tested in an independent hydraulic...
Reduced O&M Costs through Better Metallurgy
There are many areas in hydroelectric power plants where better materials of construction can reduce operation and maintenance (O&M) costs. Some of the most nagging problems deal...
Pit Turbines, an Economical Solution for Low Heads
The paper describes the experience with pit turbine design and construction at the 8 MW St. Cloud facility located on the Mississippi River in Minnesota. Major topics in the paper include...
Turnkey Hydropower at St. Cloud
The St. Cloud Hydroelectric Project is located at an existing dam on the Mississippi River in St. Cloud, Minnesota. The project consists of a two-gated spillway and an 8.6-megawatt powerhouse...
Devil Canyon Powerplant Enlargement
This paper presents the design and construction aspects of the enlargement of the existing Devil Canyon Powerplant from 120 MW to 280 MW. Subjects covered include site geology, powerhouse...
Harnessing the Allegheny: Four Low-Head Projects
The navigable portion of the river, extending northeast of Pittsburgh approximately sixty miles, contains eight lock and dam systems under the jurisdiction of the U.S. Army Corps of Engineers...
Siphon Penstock Installations at Hydroelectric Projects: A Survey of Design, Construction and Operating Experience
There can be advantages to using siphon penstocks at small hydro projects, particularly those constructed at existing dams. One problem, however, is a lack of documentation of siphon penstock...
Paradise River, a Challenging Small Hydro Development
The frequent assumption that small hydro developments are simple is not always borne out in practice. A case in point is the Paradise River Development in Newfoundland, Canada. This paper...
Harnessing the Snake: A Construction Viewpoint
The Gem State Hydroelectric Project, five miles south of Idaho Falls, Idaho on the Snake River, consists of a 900-foot-long, 40-foot-high dam; approximately four miles of earthend dikes;...
Foundation Engineering
Current Principles and Practices
The proceedings of the 1989 ASCE Foundation Engineering Congress (entitled Foundation Engineering: Current Principles and Practices) address advances in the state-of-practice and in research...
CAD Speeds Viaduct Replacement
Lack of an available detour around construction of a major viaduct spurred city officials in Reno, Nev. to build a bridge nearby to serve the purpose. Although funded separately, the permanent...
University Programs in Computer-Aided Engineering, Design, and Manufacturing
The University Programs in Computer-Aided Engineering, Design, and Manufacturing (UPCAEDM) annual conferences provide for the presentation and exchange of ideas related to current developments...
Glitches in Flitch Beam Design
Wiesenfeld proposes a set of design criteria for flitch beams. These beams, in which wood and steel sections are bolted together to act as a single structural unit, are currently covered...
Storing Sediment and Freeing Fish
When Mount St. Helens erupted in May 1980, it sent a river of pyroclastic ash and other debris into Washington's North Fork Toutle River Valley. The resulting debris pile...
Liability Traps to Avoid
This presentation shows several problem situations and the rules of the game as played by the industry and the courts. It makes three basic assumptions. One, the Materials Engineer knows...
Return to search