New Runners for Aswan High Dam Power Station
Replacing turbine runners at Egypt's Aswan High Dam Power Station is a major project because of the size, quantity and importance of these turbines to the Egyptian economy....
The Impact of Proposed Federal Income Tax Changes on the Financing of Hydroelectric Projects
The paper presents an overview of the specific proposed changes that would have the greatest direct impact on the hydroelectric power industry. Next, it presents the major conclusions...
Special Pile Foundations for a Coastal Permafrost Site
The design of the plant's foundations had to address several challenging geotechnical conditions. These included (1) 'warm' (close to 32 degree F)...
A Self-Refrigerated Gravel Pad Foundation for Large Thermal Loads
Design criteria for a proposed power plant at Thule Air Force Base, Greenland, involved both large thermal loads from the diesel engines and large static loads from an eight foot thick...
Anchorage Taps Eklutna Lake for New Water Supply
The 170 million Eklutna Water Project will furnish water to Anchorage, Alaska by the summer of 1988. The project consists of an 8,500-foot long diversion tunnel, 6 miles of 54 to 60-inch...
An Overview of Cold Region Considerations for the Design of the Eklutna Water Project
The paper presents a brief overview of cold regions considerations that were considered during the design of the various elements of the Eklutna Water Project in Anchorage, Alaska. The...
Water Treatment Facility Design for a Glacial Lake
The Municipality of Anchorage, Alaska has undertaken a major water supply project, the Eklutna Water Project, to satisfy the growing water demands of Anchorage. The source of raw water,...
Performance Study of the Lagoon at Inuvik, N.W.T.
Since 1957, Inuvik's sewage has been discharged into a lagoon situated northwest of the townsite. In 1982 the lagoon was upgraded to a two-stage system. Two primary cells...
Evaluation of Sewage Treatment Requirements in Cold Regions: Case Study?City of Whitehorse
This paper describes a method available for evaluating sewage treatment requirements in cold regions. The City of Whitehorse wastewater management situation has been used as an example...
Wastewater Plant Cold Weather Operational Problems
A questionnaire survey was conducted at biological wastewater treatment facilities in northern New England. Problems associated with various unit processes, due to cold weather operations,...
Developing a Community Water System for Shishmaref, Alaska
This paper discusses a unique water supply system for the City of Shishmaref, a moderately sized Alaska Native community on Sarichef Island in the Chukchi Sea. A three million gallon reservoir...
Effluent Dispersion Measurements Under Sea Ice
Field measurements of the dispersion of effluent from the Seawater Treatment Plant (STP) at Prudhoe Bay, Alaska, were made during April 1985. The primary objective was to determine whether...
Waterfront Stabilization Project, Kaktovik, Alaska
This paper discusses an innovative 384-foot treated-timber cribwall design utilized to control rapidly accelerating thermal erosion and establish a roadway along the bluff on the Beaufort...
Analysis of R/C Slab Under Turbine Missile Impact
Turbine missile impact on reinforced concrete barrier in nuclear reactor power plants is simulated using the finite element method. One of four full scale turbine missile impact tests...
Water and Wastewater, Time to Automate?
Water and wastewater engineers have been slow to adopt a full circle systems approach to automated monitoring and control. Such a technical tactic for controlling water and wastewater...
Demands for Innovation in Power Construction
This paper identifies some specific demands for innovation on power projects, reviews the alternatives considered to meet project objectives, and describes the resulting innovations. Examples...
Engineering Implications of Impoundment of the Indus River by an Earthquake-Induced Landslide
Historical records and physical evidence indicate that in the Himalayas of northern Pakistan a huge landslide dam was caused by an earthquake in 1840. The dam blocked the Indus River,...
Professional Training Potomac Electric Power Company (PEPCO)
Training of professionals within the Generating Engineering and Construction Group at the Potomac Electric Power Company is most intensive right after hiring but continues to the executive...
Base Isolation in the Design and Construction of Power Plant Structures
This technical paper summarizes the results of some of the recent studies performed to assure technical feasibility in isolating safety-related nuclear power plant structures. The particular...
Design and Planned Use of a 2-Kiloton Eccentric Mass Vibrator
High-level testing of large civil structures is usually not practical, due to structural damage considerations and available testing equipment. However, in the case of a joint American/German...