Mapping America is Never-Ending Task for USGS
For its first topographic surveys, begun in 1879, USGS measured distances by counting revolutions of a wheel, ran traverses by chain and compass, and used a barometer to determine elevations....

Top-to-Bottom Construction in High-Rise Buildings
This top-to-bottom construction method, called jackblock is a cousin of lift-slab. The main components are the jack and concrete block, hence the name. The top story of a building is constructed...

The Personalized System of Instruction: Death Knell for the Lecture�
In most universities, teaching methods have not changed substantially since the invention of the printing press 500 years ago. Yet in recent years, some engineering schools have shown...

Research Needs in Structural Engineering
Here are some highlights of the state of Research Needs in Structural Engineering, prepared at National Science Foundation�ASCE workshop in June 1979. Overall, the statement says, U.S....

Threaded Rebars Spin Down Time
A rebar splicing technique was a major factor in saving two year's construction time on California's $33 million, 9000 ft (2743 m) Antioch Bridge. Rebar splicing...

First Annual National Conference on Recreation Planning and Development
Recreation planning and development is a multi-disciplined field involving engineers, planners, landscape architects, structural architects and other specialists active or interested in...

PERT and CPM Techniques in Project Management
Originally published in Journal of the Construction Engrg. Division, Vol. 90, No. 1, March 1964, pp. 1-26...

Critical Path Resource Scheduling Algorithm
Originally published in Journal of the Construction Engrg. Division, Vol. 94, No. 2, October 1968, pp. 161-180...

Planning Monitoring Frequencies for CPM Projects
Originally published in Journal of the Construction Engrg. Division, Vol. 97, No. 2, November 1971, pp. 211-226...

Networking Methods for Project Planning and Control
Originally published in Journal of the Construction Division, Vol. 100, No. 3, September 1974, pp. 357-372...

New Methods in Construction Systems
Originally published in Journal of the Construction Division, Vol. 100, No. 3, September 1974, pp. 211-222...

Developments in CPM, PERT, and Network Analysis
Originally published in Journal of the Construction Division, Vol. 101, No. 4, December 1975, pp. 769-784...

Cost and Time Scaled Networks: Graphical Model
Originally published in Journal of the Construction Division, Vol. 103, No. 2, June 1977, pp. 179-190...

Discussion of Cost and Time Scaled Networks: Graphical Model
Originally published in Journal of the Construction Division, Vol. 103, No. 4, December 1977, pg. 670...

Closure of Cost and Time Scaled Networks: Graphical Model
Originally published in Journal of the Construction Division, Vol. 104, No. 3, September 1978, pg. 365...

Cost-Time Model for Large CPM Project Networks
Originally published in Journal of the Construction Division, Vol. 103, No. 2, June 1977, pp. 201-211...

Modeling Method-Productivity
Originally published in Journal of the Construction Division, Vol. 102, No. 1, March 1976, pp. 157-168...

Highway Widening Proceeds Behind Concrete Median Barrier
Precast concrete median barrier curb is being used temporarily to protect both workmen and traffic through the 3.1-mile long construction zone of a widening project along the Garden State...

Personnel Management of Engineering Organizations
Which personnel management approaches are most successful, and why? We surveyed ASCE's Sections and Branches in search of answers. And reviewed the 120 or so nominations in...

Subway Designs and Construction Methods That Cut Costs
The high cost of subway construction in the United States can be reduced by adopting station and track structure configurations, structural systems, and construction techniques best suited...

 

 

 

 

Return to search