Comparison of Hydrodynamic Parameters for a Floating Breakwater
The U. S. Army Engineer Research and Development Center is in the process of developing a Rapidly Installed Breakwater System (RIBS) for use in Joint Logistics Over the Shore Operations...
Quality Control Test for Prestressing Wires in Concrete Pressure Pipe
Prestressed concrete cylinder pipe (PCCP) was introduced in 1942 as a high pressure capacity conduit for water transmission. The principal element of the design and construction that imparts...
Tunnel with Vision
Two tunnel boring machines that are being used to bore a pair of 6.6 km long tunnels under the Westerschelde estuary in the southern Netherlands must dig through loose sand and sticky...
Effect of Column-to-Beam Strength Ratio on Seismic Performance of RC Moment Frames
Reinforced concrete (RC) moment frames are often used in building applications. During strong earthquake excitations, such buildings have been subject to soft-story or column sidesway...
The Effect of the Slab on Beam-Column Joint Behavior
The three-dimensional effect of slab interaction on frame behavior has been observed in lateral load tests on beam-column-slab elements....
High Resolution Pressure Measurements on Roofs of Low Buildings
Describing an instrumented module which was built with extremely high pressure tap density to use as a component of a roof or wall....
Water In, Water Out
Moving water into and out of the Eastside Reservoir, which will be the largest body of freshwater in southern California, requires some of the largest pumping and water conveyance systems...
On Martian Soil
Discussions are ongoing about how and when to build human settlements on other worlds. Many scientific discussions have focused on settlements on Mars, and how the initial colonists would...
Digging for Answers (Available in Geoenvironmental Engineering Special Issue only)
Research at the six facilities that make up the National Geotechnical Experimentation Sites (NGES) has included tests on minipiles, groups of driven piles, shafts drilled in rock, and...
Testing the Load (Available in Geoenvironmental Engineering Special Issue only)
The Pittsburgh District of the U.S. Army Corps of Engineers recently began construction of a new gated dam to replace a nearly 100-year-old concrete fixed-crest dam on the Monongahela...
Monitoring the Fresh Kills Landfill (Available in the Geoenvironmental Special Section only)
A unique system has been developed to assess the stability of the Fresh Kills Landfill, in New York City, using more than 260 geotechnical instruments and automatic processes. The system...
Sprinkler Irrigation
In sprinkler irrigation, water is applied to the soil using a pressurized piping system with nozzles, jets, or perforated pipe that sprays the water into the air. These sprinkler devices...
Structural Surgery
Structural engineers had to transform four existing buildings and two new buildings into a new non-profit center for Jewish history. The buildings were of varying ages and had different...
Cap of Concrete
The roof of a new $84 million arena in New Orleans was built using techniques usually seen in tied-arch concrete bridges. The concrete components of the roof carry the large compression...
Up against the Wall (available in Geoenvironmental special issue only)
A tight site in Portland, Oregon, bounded by existing roads and a light rail line and bordered by underground utilities, required project engineers to develop a new type of shoring wall...
Under Pressure
The Arrowhead East and West contracts for the Inland Feeder water conveyance system being built in California consist of 51,500 ft (15,700 m) of tunnels that cross the San Andreas Fault...
For the Duration
The U.S. Army Corps of Engineers developed a new grouting method called duration grouting when constructing the foundations for the Portugues Dam in Ponce, Puerto Rico. The site is marked...
Shake, Rattle and Hold (Available in Structural Engineering Special Issue Only)
In-situ lateral load tests of two bridge bents were conducted on Interstate 15 in Salt Lake City, Utah, to determine the strength and ductility of an existing concrete bridge and the improvements...
Stabilizing the Stacks
Spenser White and Prentis designed a hybrid soil nailing system to ensure that a historic library on the Bryn Mawr, Pennsylvania, campus would not be damaged during adjacent construction...
Blasting Densifies Volcanic Debris (Available only in
The relatively new ground improvement technology of blast densification overcame soil problems posed by volcanic ash at Mount St. Helens National Volcanic Monument. In 1993 WSDOT began...
Return to search