Product Quality and Process Control in the Windscale Vitrification Plant
The Windscale Vitrification Plant (WVP) is owned and operated by British Nuclear Fuels (BNFL) at the Sellafield Site in England. The purpose of the facility is to condition the high level...
Tidal Dynamics and Estuarine Management in the Humber Estuary, England
The rate at which tidal energy is dissipated, that is the power expenditure, at any point along an estuary is dependent on the morphology of the estuary. The most important of the morphological...
A Study of the Impact of the Dumping of Spoil on Beach Processes
The amenity value of beaches along the North East coast of England is reduced because of the continuing practice of dumping colliery spoil directly onto the beaches for dispersal by the...
Controlling Nitrogen Loading to Coastal Waters
Of the countless contaminants that reach coastal waters, nitrogen is one of the most problematic and least regulated. There is ample evidence that many coastal embayments are overwhelmed...
The Sedimentary Organisation and Behaviour of Drift-Aligned Gravel Barriers
Drift-aligned barriers formed of coarse clastic materials and described in terms of their organisational evolution at two levels, a) sorting and selection of clasts; b) development of...
Atlantic Salmon Smolt Movement and Behavior at Vernon Hydroelectric Station
Behavior of emigrating Atlantic salmon smolts (Salmo salar) was studied at New England Power Company's (NEP) Vernon Hydroelectric Station located on the Connecticut River,...
An Expert System for Control Curve Evaluation During Drought
This paper presents ongoing research into the automation of control curve generation and the development of an expert system for reservoir management for North West Water of Warrington,...
Hydropower Development at North Hartland Lake, Vermont
The purpose of this paper is to give a short history of the first hydropower development by non-Federal interests at a Corps of Engineers flood control dam and reservoir within the jurisdiction...
Evaluation of Air Quality Methods in the Asbestos Work Area
Air monitoring is a technique that is routinely used to measure the level of asbestos in a given airspace. This technique has changed significantly since its first use in the asbestos...
Monitoring the Effects of the Pipe Insertion Machine Technique
The results of an experimental study of the pipe insertion machine are presented in this paper. Strains induced in an adjacent pipeline, soil displacement, pipe deflection and vibrations...
Overview o New England Coastal Flood Study Methodology
This paper presents an overview of the development of methologies used to determine the probabilistic flood levels for New England coastal flood insurance studies. The Federal Insurance...
Restoration of Atlantic Salmon to Maine: Overcoming Physical and Biological Problems in the Estuary
By the early part of the Twentieth Century, all native runs of anadromous Atlantic salmon (Salmo Salar) were extirpated from rivers of the United States, with the exception of a few small...
Nantucket's Broad Creek Opening
On September 20-21, 1961 a severe coastal storm, the remnant of hurricane Esther, formed a 1,200 foot wide, 20 foot deep opening in a barrier beach (Smith's Point at Broad...
Aquatic Dredged Material Disposal in New England
The Disposal Area Monitoring System (DAMOS) is a large multi-disciplinary environmental monitoring program instituted by the New England Division (NED) of the U. S. Army Corps of Engineers...
Resident Only Moorings: A Sign of the Times Or an Endangered Species?
As the demand for mooring space has increased in various coastal harbors throughout New England, many New England coastal communities have enacted legislation giving either explicit or...
Estimating Low-Flow Frequencies of Ungaged Streams in New England
Equations to estimate low flows were developed using multiple-regression analysis with a sample of 48 river basins, which were selected from the U. S. Geological Survey's...
HydroMAX; Computerized Hydropower Scheduling
The New England Power Exchange (NEPEX) is currently using the HydroMAX Program to schedule daily hydropower operations for the 17 stations in the 11,250 square mile Connecticut River Basin....
Wastewater Plant Cold Weather Operational Problems
A questionnaire survey was conducted at biological wastewater treatment facilities in northern New England. Problems associated with various unit processes, due to cold weather operations,...
Evolution of Water Organisations in England and Wales
Although by the early 1960's there was in existence a large body of legislation dealing with water matters, the Water Resources Act 1963 provided for the first time a significent...
Acid Deposition in the Wind River Mountains
National attention has been focused on the discovery of acidified lakes in the Adirondack Mountains of New York and elsewhere in New England. It is commonly believed that the West, in...
Return to search