Borderline Estuaries and Interstate Management Programs
Estuaries bordered by more than one state authority often suffer from contrasting and/or conflicting management practices along the shores of a continuous body of water. Management strategies...
Controlling Nitrogen Loading to Coastal Waters
Of the countless contaminants that reach coastal waters, nitrogen is one of the most problematic and least regulated. There is ample evidence that many coastal embayments are overwhelmed...
Atlantic Salmon Smolt Movement and Behavior at Vernon Hydroelectric Station
Behavior of emigrating Atlantic salmon smolts (Salmo salar) was studied at New England Power Company's (NEP) Vernon Hydroelectric Station located on the Connecticut River,...
Composite Twin Tub Bridge Erection Intersection of Interstate I-84 and I-94 in Hartford, Connecticut
Curved bridge erection requires detailed preparation by the contractor, plus a sharing of responsibility and liability between the owner, designer of the new structure and the contractor....
Marina Parking Study
This marina parking study establishes a rationale for determining parking demand at marinas on the north shore of Long Island Sound in Connecticut and New York. The study was performed...
Site Specific Hydrological Model for Permaculture Application
This paper presents results of a study conducted on a small pond and watershed in Waterbury, Connecticut. The Soil Conservation Service method presented in Technical Release #55 (TR 55),...
Drought Indication and Response
A study of rainfall and reservoir level data was conducted on the water supply system of South Central Connecticut to investigate the possibility of developing reliable, easy to use drought...
Underwater Foundations for a Jack-up Barge
Innovative underwater foundations were developed to provide a solid base for the legs of a large jack-up barge needed by General Dynamics to transport heavy components from Quonset Point,...
Improvement of Dissolved Oxygen Levels at Shepaug Hydro Station
Discharge from Shepaug Dam in Connecticut fall below the state standard for dissolved oxygen in summer and early fall, because of thermal stratification of the upstream eutrophic reservoir....
A Non-Federal Development at a Federal Project
The Colebrook River Lake project is a Corps of Engineers multipurpose reservoir located in northwestern Connecticut. The hydro project, designed and built by the Catalyst Energy Corporation...
Studies of Fish Protection Methods at Hydroelectric Plants
Five largely untested but economical fish-protection systems were tested at sites throughout North America. The process of selecting laboratory and field test sites was completed at the...
Predicting Channel Recovery from Sand and Gravel Extraction in the Naugatuck River and Adjacent Floodplain
Gravel extraction at five sites along the Naugatuck River in Connecticut is of sufficient magnitude that channel recovery to pre-mining morphology is expected to require up to several...
Long Island Sound: Issues, Resources, Status, and Management
The Long Island Sound estuary is an unusual and complex estuary which probably serves more people than any other estuary in the United States. In spite of the enormous and varied stresses...
Shallow Ocean Disposal of Contaminated Dredge Material
The contaminated dredged materials from harbors and waterways along heavily populated coastal areas such as Connecticut must often be disposed at shallow ocean sites. To isolate the contaminants...
Connecticut: A Success Story
The Connecticut Department of Transportation (ConnDOT) had warned the state legislature that its highways and bridges would continue to deteriorate without increased funds for inspection,...
The Success Story of Connecticut Limousine
Connecticut Limousine operates scheduled limousine service between various Connecticut communities and the three New York area airports. It has achieved a nearly 50 percent market share....
Case Study?Wyre Wynd Hydroelectric Project
To combat rising energy costs, Southwire Company, a manufacturer of wire and cable products headquartered in Carrollton, Georgia, began generating its own electrical power at the company's...
HydroMAX; Computerized Hydropower Scheduling
The New England Power Exchange (NEPEX) is currently using the HydroMAX Program to schedule daily hydropower operations for the 17 stations in the 11,250 square mile Connecticut River Basin....
The Middletown (CT) Riverfront Development Plan
Middletown is strategically located on the banks of the Connecticut River in the central part of Connecticut. Middletown has a tradition as a maritime center. During the seventeenth and...
Harbor Management a Cooperative Effort in Connecticut
Connecticut Legislature passed an Act concerning harbor management which enables coastal communities to establish harbor management committees and prepare harbor management plans. This...