Building Code Requirements and Specification for Masonry Structures
Containing Building Code Requirements for Masonry Structures (TMS 402-08/ACI 530-08/ASCE 5-08, Specification for Masonry Structures (TMS 602-08/ACI 530.1-08/ASCE 6-08) and Companion Committees
The Code covers the design and construction of masonry structrures while the Specification is concerned with the minimum construction requirements for masonry in structures. Some of the...
Fundamentals of Risk Assessment
Risk, expressed in terms of potential human sufferings and economic losses, is very real and its significance is particularly important when considering natural hazards. For effective...
Analytical Solutions for Coupled Reactive Transport Equations
Modeling the transport of reactive contaminants is one of the key challenges faced by groundwater engineers worldwide. Specifically, problems involving the transport of sequentially decaying...
Infrastructure Planning Handbook
Planning, Engineering, and Economics
The book covers the concepts, methods, and management skills necessary to plan and maintain infrastructure. Topics include major infrastructure projects in context; master planning; infrastructure...
Numerical Integration
This chapter discusses numerical integration in Microsoft Excel....
Toronto Takes Off
Travelers using Toronto's Pearson International Airport will soon be passing through a new, state-of-the-art terminal, the centerpiece of a 10-year airport redevelopment project....
High-Impact Innovation
As engineers increasingly embrace the storm-water management approach commonly known as low-impact development (LID), the number of innovative LID projects is growing across the country....
Repairing Pittsburgh's Portal
Engineering the rehabilitation of Pittsburgh's Fort Pitt Bridge and Fort Pitt Tunnel involved an extensive inspection of their condition and a detailed evaluation of alternative...
The Best Alternative
The City of Portland, Oregon, is using a hybrid contracting scheme that combines the scheduling advantages of design/build with the control of a construction manager arrangement to construct...
Nonlocal Integral Formulations of Plasticity and Damage: Survey of Progress
Modeling of the evolution of distributed damage such as microcracking, void formation, and softening frictional slip necessitates strain-softening constitutive models. The nonlocal continuum...
A Decision Support System for Drought Management Planning
Traditional drought management planning has focused on curtailment of demand by instituting voluntary or mandatory restrictions on water consumption when regional hydroclimatic indicators...
Characterization of Anaerobic Microbial Consortium Response to Thiol-Reactive Compounds
The activity of anaerobes in wastewater treatment processes can be limited when a toxicant enters the system. For certain toxicants, along with the decrease in metabolic activity, an efflux...
Under Cover
In capping a 190-acre hazardous landfill in metropolitan Los Angeles, engineers saved time and money by relying on a construction method seldom used in the environmental sector: design/build....
Stability and Loads
This chapter examines stability and loads. Topics include stability and lateral load resistance during construction; effective lengths of cantilever columns; effect on stability of frame...
Design and Construction of the Pier J Breakwaters at the Port of Long Beach, California
Several different alternatives to mitigate surge activity were investigated. The most acceptable solution was a pair of new breakwaters that altered the basin geometry to change the basin...
Construction Factors and Monitoring Methods Relating to the Performance of Ventura Breakwater Core Loc Repair
In 1999 the Los Angeles District of the U.S. Army Corps of Engineers (USACE) repaired the north Ventura breakwater head. The head was rebuilt using 2-ton underlayer stone armored with...
St. George Habor?Berm Breakwater Construction Considerations
During the period 1984-1987 three berm breakwaters with a total length of approximately 800 meters were constructed at St. George Harbor on St. George Island in the Pribil of Chain of...
Application of Multibeam Echo Sounding and Side Scan Sonar for Mapping of Shoreline Protection Revetments
The use of multibeam survey methodology coupled with high precision positioning systems for the mapping of shoreline protection features and the adjacent offshore areas allows development...
Raising the Bar - 345kV Uprating
The paper presents solutions to increasing the transfer capacity (book rating) of two critical 345kV tie lines. Described are computer modeling techniques using laser survey data coupled...
Effect of Aluminum Compression on ACSR Conductor Sags at High Operating Temperatures
Deregulation and restructuring are sweeping the electric utility industry in the United States. As a result, many utility engineers are analyzing, re-rating, and upgrading their most critical...
Return to search