$1.9-Billion Eastside Reservoir Project Concept to Construction in 5 Years
Rocky Reach Kaplan Turbine Replacement
Characterization of Seismic Sources and Estimated Ground Motions for Lake Almanor and Butt Valley Dams, Plumas County, Northeastern California
Geotechnical Investigations at Butt Valley and Lake Almanor Dams
Seismic Stability of Lake Almanor and Butt Valley Dams
Decision Analysis: Lake Almanor and Butt Valley Dams
Dam Safety Meets Environmental Review, and Both Survive
Integrated Pumped Storage and Water Supply Operations
Design and Construction of the River Road Reservoir
Strategic Hydropower System Rehabilitation
Key Design and Construction Features of Sanchung Pumped-Storage Power Project, Korea
The Insitu Repair of the Bottom Cover of the 300MW Pump Turbine at Dinorwig Power Station
The Bulb Turbine Design of the Nineties Applied in a Brazilian Powerplant
Ghazi Barotha Hydropower Project, Pakistan
Mozambique: A Feasibility Study for Hydroelectric Development
Reservoir and Shoreline Management - What Uses are Allowable for the Future?
Using Cooperative Development to Supply Project Recreation Demands
Recreation Management on the Lewis River: Problems and Solutions in the Pacific NW
Spatial Solutions to Recreation Use
Case Study for the Upgrade and Rehabilitation of a Pumped Storage Installation - Muddy Run Powerhouse
Return to search