Computer Aided River Basin Management in the Alps
The present paper outlines progress in developing river basin management potential through joint research on several Alpine River Systems including the Avisio, Brenta, and Cordevole. Applications...

Response of the Citanduy River to Developments
The sinuous alluvial reach of the Citanduy River in Java, Indonesia has been surprisingly stable in spite of man-made cutoffs which have reduced the channel length from 98. 7 km to 78....

Classification and Behavior of Meander Migration
Meander migrations on the Mississippi River between Cairo, Illinois and Baton Rouge, Louisiana for the time period between the years 1765 and 1930 were classified into six categories based...

Management Strategy
Meanders of sinuous streams are often cut off by natural action or by man in order to improve conveyance or navigability. Cutoff bendways, as long as they remain aquatic, provide extremely...

A Model Relating Water and Sediment Yield to Upstream Agricultural Practices
A physical-process model is formulated to quantify daily water and sediment yield as related to upstream land use, land management, and soil and water conservation measures. This model...

A Computer Model for Oil Slick Transport in Rivers
A computer model for simulating oil slick transport in rivers is presented. In the model the effects of advection, spreading, evaporation, and dissolution on the transformation of an oil...

Orleans Parish Drainage Improvements
A case study of the development of an urban drainage master plan for Orleans Parish, Louisiana is presented. The Parish, which occupies an area of approximately 98,000 acres, lies entirely...

Flow and Sediment Transport in Curved Channels with Nonuniform Bed Material
Described is a scheme for controlling the exchange of grain sizes between bed and bed load in a curved alluvial channel. The scheme is an integral part of a model for simulating spatial...

A New Technique for Measuring Fine Sediment Accumulation in Gravel Bed Streams
The collection and analysis of bed material samples has been a standard practice for determining the quantity of fine sediments (less than 3. 4 mm diameter) in stream gravels. However,...

Sediment Intrusion into the Substrate of Gravel Bed Streams
A physically-based model was developed to simulate the intrusion of fine sediments into stream gravel substrates and its effects on intragravel flow. The model is capable of simulating...

A Computer Program Simulation of the Effect of Upstream Agricultural Practices on the Survival of Salmonid Embryos
A physical-process based computer program was developed to quantify the cause and effect relationship between the survival of salmonid embryo and upstream agricultural practices. The impact...

Physical Habitat Simulation and the Moveable Bed
One objective of an instream flow analysis is to quantify a flow that will maintain the existing channel and/or flush fine material from the bed. Five empirical approaches to determine...

Development of the Nauvoo Point Plant Beds
In Pool 19, Mississippi River, the accumulation of sediment has resulted in soft-substrate benthic communities or macrophyte beds. Three areas in the downstream 12 miles of the 46. 3 mile...

Algorithms for Automatic Control of Diversion Dams
The application of local automatic control for the releases from a diversion dam that has intermittent river inflow is limited. For this case, it is better to install a remote monitoring...

Queensland, Australia - River Diversion Schemes
The east coast of the State of Queensland has high or very high annual rainfall which declines rapidly with distance inland. The area west of the Great Dividing Range, which parallels...

Garrison Diversion Unit?An Example of United States-Canada Cooperative Investigation
Canada and United States have cooperated in the investigation of disputed international waters on numerous occasions. The study of the Garrison Diversion unit is an example of an exhaustive...

Waterway is Public Works Landmark
The $2 billion, 234 mile Tennessee-Tombigbee Waterway connects the Tennessee River and the Gulf of Mexico at Mobile. The biggest Corps of Engineers civil-works project ever, it was created...

Some Perspectives and Philosophies on Risk-Based Decision Making in Water Resources
The authors have selected four perspectives of the water resources decision problem that illustrate how formal risk-based approaches may be applied - an economic perspective, an environmental...

Environmental Considerations in Risk-Based Decision Making in Water Resources
In the hypothetical Royal River Project there are several factors pertaining to environmental issies; these factors have a bearing on selection among the several alternatives and lead,...

A Methodology for Risk-Benefit Analysis of Lock-and-Dam Rehabilitation in the U.S. Corps of Engineers
The U. S. Army Corps Engineers operates and manages some 250 locks and dams in major rivers and ports throughout the U. S. At present, many of these structures are thirty-five to forty-five...

 

 

 

 

Return to search