In Situ Testing Performed at Jackson Lake Dam
Jackson Lake Dam was rehabilitated from 1986 to 1988 to increase seismic stability. Final foundation improvements consisted of dynamic compaction and mixed inplace soil cement columns....
Landslide Stabilisation at the Clyde Power Project, New Zealand
The Clyde Power Project is a hydro electric development on the Clutha River in the South Island of New Zealand. A wide range of stabilization measures have been used to treat several large...
Improving Dam Safety Using a Fin Drain
Bloemhoek Dam is an embankment dam with a maximum height of 21 m, which leaked severely after first filling in 1978. This leakage resulted in the development of `boils' over a portion...
The Douglas Dam Emergency Response and Rehabilitation
Through the timely response of the Owner, the potential failure of Douglas Dam was averted, and lives and property downstream were protected. The economic losses created by loss of irrigation...
Remedial Works at Troneras and Miraflores Dams in Colombia
The 38 m high Troneras and the 55 m high Miraflores earth dams were built in the period 1959-1965. The dams are composed of residual soils and founded on a deep residual overburden. Significant...
Rehabilitation of a Toe Drain
Old or improperly designed toe drains can cause trouble for embankment dams. Toe drains installed without proper filtering can provide an easy course for internal erosion and piping of...
General Design and Construction Considerations for Remedial Seepage Control
All earth and rock-fill dams are subject to seepage through the embankment, foundation and abutments. Methods for remedial seepage control include storage restriction, grouting, upstream...
Hydration Properties of Shotcrete with an Accelerator Based on Calcium Aluminate
A new powder-type accelerator based on calcium aluminate has been used for shotcrete in underground construction. This accelerator can be applied to all types of shotcreting. The shotcrete...
Preliminary Assessment of Fault Rupture Hazard at the Yucca Mountain Site Based on Expert Judgement
The judgments of seven earth science experts were elicited to quantify the uncertainties associated with the likelihood of fault displacement through the proposed repository at Yucca Mountain...
Are Colloids Important for Transport Rate Assessment of Radionuclides? A Microscopic Modeling Approach
Understanding the transport phenomena of radionuclides migrating through weakly-permeable rocks forms an essential part of far-field safety assessment studies. Colloidal matter can be...
Field Investigation of Mining-Induced Seismicity on Local Geohydrology
Hydraulic response of the rock mass due to earthquakes is one of the concerns in the assessment of the long-term performance of a repository. Studies performed by other researchers indicated...
Dependence of Radionuclide Sorption on Sample Grinding Surface Area, and Water Composition
Experiments are described that were designed to quantify the dependence of sorption properties and surface area on the crushed-particle size of the rock samples used in batch sorption...
Assessing Fault Rupture Hazard for the Proposed Repository at Yucca Mountain, Nevada: Demonstration of a Methodology Using Expert Judgments
As part of the Electric Power Research Institute's High Level Waste (EPRI HLW) performance assessment, we have developed and demonstrated a methodology to estimate the magnitude and likelihood...
Basin Scale Management of Surface and Ground Water
An important element in the economic development of many regions of the Great Plains is the availability of reliable water supply. The primary supply has tended towards developing groundwater...
Innovative Wetland Re-creation in Urban Setting
The project site is a 106 hectare, mixed-used, commercial development east of Tampa, Florida and at the westerly limit of the town of Brandon, Florida. Delaney Creek traverses the site...
Local Agency Regulation: The Policies and Process of Surface Water Protection
King County, Washington, adopted a Surface Water Design Manual in January 1990. This manual, which has served as a resource guide in developing similar manuals throughout the Pacific Northwest...
A Methodology for the Evaluation of Global Warming Impact on Soil Moisture and Runoff
Global warming is expected to increase the intensity of the global hydrologic cycle. Precipitation and temperature patterns, soil moisture requirements, and the physical structure of the...
A Planning Strategy for Safe Drinking Water Act Compliance
This paper presents a simple planning strategy for drinking water utilities that will allow them to move ahead with system upgrades and specific regulatory compliance programs even though...
Water Resources Management Issues Confronting Developing Countries
Water resources planning, development and management in most of the developing and rapidly developing countries have been driven by consumer interest. The rapid urbanization, industrialization,...
Technical and Organizational Constraints on Surface and Groundwater Irrigation in Small-Holder Areas of S. Asia
Variable irrigation supply and the independent character of the S. Asian small-holder combine to present a difficult problem in irrigation management. Attempts to introduce advanced technology...
Return to search