Execution and Evaluation of High Capacity Caisson Load Tests in Glacial Deposits
As part of the Boston Harbor clean up project, the new 1,000 mgd Deer Island Sewerage treatment plant includes ten 240 feet high egg-shaped 'residuals' tanks. Contract documents called...

Slip-Lining Solution
Grouting the annular space between a corroded sewer pipe and newly installed liner pipe is a stage of a typical sewer line rehabilitation project which contains hidden problems and difficulties....

The Big No-Dig
As part of the Boston Harbor cleanup project, engineers will have the opportunity to make a rare, side-by-side comparison of open-cut construction and no-dig technology during the Wellesley...

Laupahoehoe Harbor Planning, Design, & Construction
Laupahoehoe Harbor provides access to the fertile fishing grounds along the northeast or Hamakua coast of the island of Hawaii, Hawaii. The planning, design, and construction of Laupahoehoe...

A Design Manual for Coastal Fluidization Systems
This paper summarizes a recently completed design manual on fluidization systems to manage sand in the coastal environment for sand bypassing at inlets and harbor mouths and for creating...

Tackling Trapped Sediments
Crater-sink fluidization has been used to recover sediment from harbors for the past couple of decades. Can this method bypass sediment around dams and return it to eroded beaches, solving...

Motown Tunneling
When finished in 1993, Wayne County Michigan's $69 million wastewater treatment/sewer project will link outlying areas such as Dearborn with sewage treatment facilities in...

Turbulence, and Energy Loss, at Combining Pipe Junctions
Efforts to measure and describe the loss of energy at 90? sharp-edged junctions are described. The work is focussed on energy losses at discharge and area ratios for which there are no...

General Mechanism of Turbulence
By considering the vortex structures of turbulence and using the concept and theory of the pulsative convection and diffusion of instantaneous vorticity in a viscous fluid motion, the...

Wave Propagation in Solids
The last fifty years have seen the development of a large number of application of the theory of wave propagation in solids to problems of interest to civil engineers. Most notable have...

Piping in Earth Dams of Dispersive Clay (Paper introduced by Norman L. Ryker)
In 1971 Jim Sherard was engaged to investigate the common failure of a group of Soil Conservation Service (SCS) floodwater retarding earthfill dams built between 1957 and 1970, eleven...

Stabilizing Drop Structure by Drainage Modifications
East Drain Terminal Drop Structure is located in East Drain, an open toe drain of Palmetto Bend Dam, in the tide water area of south Texas. The drop structure was threatened by piping...

Degradation of Ground Water by Tetrachloroethylene
Ground water from many municipal water wells in California has been degraded by tetrachloroethylene (PCE) at concentrations above the drinking water standard. Investigations conducted...

Case Studies of Semi-Closed Pipeline Systems for Flexible Deliveries
The semi-closed pipeline system using the best aspects of the open and the closed pipeline systems, has many applications. It is the best adapted system for use with the variable flow...

Seismic Rehabilitation of Seattle's Pier 69
The Port of Seattle, one of the largest on the west coast of North America, made a strong statement regarding their support for reusing existing structures when a decision was made to...

West Point Temporary Construction Dock
The West Point temporary construction dock is designed to provide construction access for the West Point treatment plant project located in Seattle, Washington. The dock plays a major...

Building a Pipeline?Not a Flow Through Process
This paper will illustrate that the planning, design, and construction of a 32-mile water supply pipeline from Stockton Lake to Springfield involves more than just digging a trench, placing...

Design Criteria and Specifications for Pipeline Rehabilitation Projects
Pipeline rehabilitation, while not a completely new technology, is nevertheless a fairly recent development, just now coming to the forefront as to common usage. It is not however a fail-safe...

Cost of Rehabilitation of Water Distribution Systems
The Chester Water Authority was established in 1868 and supplies water to residential and industrial customers in three counties in Southeastern Pennsylvania, and in addition, wholesales...

Water Main Rehabilitation Using Silicote Lining
In an attempt to find a cost effective rehabilitation alternative for over 320 miles of unlined distribution water main, the Louisville Water Company has evaluated a new rehabilitation...

 

 

 

 

Return to search