Settlement and Stability of Ocean Disposal Mounds
This study examines the engineering behavior of dredged material disposal mounds in Long Island Sound. The study area is located about eight miles off the coast of New Haven where several...

Plunge Pool Erosion in Cohesive Soils at Two Dams in Kansas
Results of a field study of two plunge pools scoured by horizontal pipe outlets discharging on cohesive channels are analyzed. Formulas for critical tractive shear stress based on plasticity...

Compression Rings Support Deep Cut
The plans for building the Cuyahoga Valley Interceptor Lift Station in Cleveland, Ohio, called for 126 ft. (38.4 m) by 105 ft. (32 m) construction, some 80 ft. (24.4 m) below grade. Bracing...

Testing Concrete in Place
Although modern concrete construction has developed during the past 60 years, one aspect has remained essentially unchanged�the use of molded cylinders tested in compression to estimate...

Foundation Soil Preload Saves $164,000
Soils in the lower Mississippi valley are highly compressible and present a challenge to structural foundation designers. Rather than support power plant structures on piles, one design...

Dredge-and-Fill Saves $2 Million at Steel Mill Built in Swamp
The Georgetown Texas Steel Corp., in late 1973, accepted the challenge of developing a previously cleared cypress swamp on the east side of the Neches River across from Beaumont, Texas....

Soil Improvement
History, Capabilities, and Outlook
This report is intended to help engineers meet the need for practical, efficient, economical, and environmentally acceptable means for improving unsuitable soils and sites, for expanded...

Pitfalls of Overconservatism in Geotechnical Engineering
The article cites at least three reasons why geotechnical engineers may be overconservative: (1) They may try to satisfy unreasonable standards established by themselves or others; (2)...

 

 

 

 