Constraints of Personnel Staffing and Funding
Staffing and project funding are discussed in this paper as they relate to the accomplishment of the construction office responsibilities for the Central Arizona Project. General staffing...

Streamflow Losses in the Santa Cruz River, Arizona
The discharge and volume of flow in a peak decrease as the peak moves through an 89-mile (143 km) reach of the Santa Cruz River. An average of three peaks per year flow the length of the...

Better Management Information
Microcomputers can improve managerial productivity by tailoring data more specifically to management's needs and providing information for decision-making more quickly. The...

Drip Irrigated Cotton: Economics and Water Savings
Groundwater withdrawals for cotton production in the arid Southwest account for about 15 percent of all groundwater withdrawals. In Arizona, cotton's proportion of groundwater...

Arizona's Statewide Pavement Management System
A pavement management system developed for Arizon's 7400-mile network of highways has resulted in a savings of $14 million in its first year and a forecast savings of $101...

Arizona's Water Strategy: Bring More In and Restrict Its Use
Decades of pumping groundwater faster than the natural rate of replenishment have lowered Arizona's water table to record depths and caused land subsidence and fissures. The...

Value Engineering and Cement-Bentonite Cutoff Wall Save Dam Project for Arizona Indian Tribe
Value engineering showed how it was possible to save $1 million in construction costs for the San Carlos River Dam, east of Phoenix, Ariz. The proposed dam site was moved to take advantage...

Miami Riot�Will a Phoenix Rise from Ashes�
In May, inner-city black residents of Miami, Florida, looted and burned about 300 buildings in their neighborhoods. The cause is detailed�their perception that the judicial system was...

Full-Depth, Full-Width Design, and Prestressed Concrete Pave the Way for Arizona's Highways
In an attempt to resolve design problems of Arizona's non-reinforced portland cement concrete pavements, a series of test installations are being made involving a comparison...

502-ft Diameter Laminated-Timber Dome Provides Fast, Low-Cost Cover for Arizona Stadium
Varex Dome, a 502-ft diameter engineering marveel of glue laminated timber, was built in record six months erection time. This dome shell structure forms both walls and roof for the new...

Water for the Southwest
Historical Survey and Guide to Historic Sites
In this document, a brief narrative history of the effects of the people who lived in the area (prehistoric Indians, the Spanish, and the Anglo-Americans) to secure and maintain water...

 

 

 

 

Return to search